Construction of a canal using the San Juan River as an access route to Lake Nicaragua was first proposed in the early colonial era. After the United States purchased the French interests in the Panama Canal in the early 20th century, it decided not to build in Nicaragua, but it secured rights and conducted studies for such a canal as a supplement.

In June 2013, Nicaragua's National Assembly approved a bill to grant a 50-year concession to finance and manage the project to the HK Nicaragua Canal Development Investment Group (HKND) headed by Wang Jing, a Chinese businessman. The concession could have been extended for another 50 years once the waterway was operational.

In 2015, media reports suggested the project would be delayed and possibly cancelled because Wang's personal wealth declined greatly as a result of the 2015–16 Chinese stock market crash. "Major works" such as dredging were to take place after the finishing of a Pacific Ocean wharf, whose construction was planned to start in late 2016. The Nicaraguan government failed to present reliable information about whether or not the project could be financed, thus casting doubt over whether it would be completed. The HKND Group stated that financing would come from debt and equity sales and a potential initial public offering (IPO).

By May 2017, no concrete action had been taken toward constructing the canal and further doubts were expressed about its financing. In February 2018, analysts widely viewed the project as defunct, though the head of the project insisted work was on-going and HKND, which closed its offices in April 2018, retained the legal rights to the concession for the canal and side projects.

In May 2024, Nicaragua's congress canceled the concession to HKND.

History

Until the beginning of the 20th century, before the opening of the Panama Canal, Nicaragua used to be the main overland trade route and hub of transshipment of goods between ocean-going vessels on the Atlantic side and those on the Pacific. In the meantime, the idea of constructing a man-made waterway through Central America has been thought about throughout history. The colonial administration of New Spain had conducted preliminary surveys. The routes suggested usually ran across Nicaragua, Panama, or the Isthmus of Tehuantepec in Mexico.

The history of attempts to build a canal across Nicaragua connecting the Caribbean Sea and thus the Atlantic Ocean and the Pacific Ocean goes back at least to 1825 when the Federal Republic of Central America hired surveyors to study a route via Lake Nicaragua, 32.7 metres (107 ft) above sea level. Many other proposals have followed. Despite the operation of the Panama Canal, which opened in 1914, interest in a Nicaragua canal has continued. With emergence of globalization, an increase in commerce and the cost of fuel, and the limitations of the Panama Canal, the concept of a second canal across the American land bridge became more attractive, and in 2006 the president of Nicaragua, Enrique Bolaños, announced an intention to proceed with such a project. Even with the Panama Canal expansion project, which began commercial operation to allow modern New Panamax vessels on 26 June 2016, some ships would be too big for the Panama Canal.

On 26 September 2012, the Nicaraguan Government and the newly formed Hong Kong Nicaragua Canal Development Group (HKND) signed a memorandum of understanding that committed HKND to financing and building the "Nicaraguan Canal and Development Project". HKND Group is a private enterprise.

The Nicaraguan government subsequently approved the Master Concession Agreement with HKND on 13 June 2013 thereby granting "the sole rights to the HKND Group to plan, design, construct and thereafter to operate and manage the Nicaragua Grand Canal and other related projects, including ports, a free trade zone, an international airport and other infrastructure development projects". The agreement would have lasted for 50 years and was renewable for another 50 years. HKND would have paid the government of Nicaragua US$10M annually for 10 years, and thereafter a portion of the revenue starting at 1% and increasing later. Stratfor indicated that after 10 years, ownership shares would periodically be handed over to Nicaragua, so that after 50 years Nicaragua would be the majority shareholder.

The HKND Group performed a preliminary study phase of development to assess the technological and economic feasibility of constructing a canal in Nicaragua, as well as the potential environmental, social, and regional implications of various routes. The canal and other associated projects would be financed by investors throughout the world and would generate jobs for Nicaragua and other Central American countries.

Initial findings of the commercial analysis conducted by HKND Group indicate that the combined effect of growth in east–west trade and in ship sizes could provide a compelling argument for the construction of a second canal, substantially larger than the expanded Panama Canal, across Central America. The projection at the time was that in the 2020s, growth in global maritime trade is expected to cause congestion and delays in transit through the Panama Canal without a complementary route through the isthmus, and by 2030, the volume of trade that a Nicaragua Canal could serve would have grown by 240%.

On 10 June 2013, The Associated Press reported that the National Assembly's Infrastructure Committee voted nearly unanimously in favor of the project, with four members abstaining. On 13 June, Nicaragua's legislature passed the legislation granting the concession. On 15 June, Nicaraguan President Daniel Ortega and the billionaire chairman of HKND Group, Wang Jing, signed the concession agreement giving HKND Group the rights to construct and manage the canal and associated projects for 50 years. An HKND Group press release read, "HKND Group successfully obtains exclusive right to develop and manage Nicaragua Grand Canal for 100 years." Under the exclusive contract, Wang could skip building the canal (and making any payments to Nicaragua) and instead simply operate lucrative tax-free side projects.

Wang announced at a press briefing in June 2013 that he had successfully attracted global investors to the $40 billion project. In January 2014, Wang and Ortega issued a statement that the project's construction would begin in December 2014 and end in 2019.

On 7 July 2014, a 278 kilometres (173 mi) route for the Nicaragua Canal was approved. The proposed route started from the mouth of the Brito River on the Pacific side, passed through Lake Nicaragua, and ended in the Punta Gorda River on the Caribbean. The proposed canal would be between 230 and 520 metres (750 and 1,710 ft) wide and 27.6 metres (91 ft) deep. The Toronto Star noted that Chinese engineer Dong Yung Song said the canal's design called for the creation of a 400-square-kilometre (150 sq mi) artificial lake. The water to fill the canal's giant locks would come from the artificial lake, not from Lake Nicaragua.

Ortega, whose government approved the agreement within one week in June 2013, reportedly perceived the canal as the second phase of the Nicaraguan Revolution, predicting that it would pull Nicaragua out of poverty and lead to the creation of 250,000 jobs; HKND said the project would create 50,000 jobs, about half from abroad, mainly China.

The Moscow Times reported in 2014 that Russia was willing to help build the Nicaragua Canal, viewing the project in part as an opportunity to pursue strategic interests in the region. Construction was to begin on 29 December 2014, and officially started a week earlier. However, owing to Nicaragua's volatile climate and seismic activity, feasibility concerns emerged over the project's future. In November 2015, HKND announced that they would postpone the construction of locks and excavations to late 2016 to fine-tune the design.

The Nicaraguan Canal and Development Project saw business rivalry greatly intensify in late 2014. China Harbor Engineering Company, an experienced construction company, offered to design, construct, and finance a fourth set of locks in Panama, where it opened a regional headquarters. If built to the width of the proposed Nicaragua Canal, it would cut across a far shorter distance, and still cost only $10 billion, according to the firm. Panama is in a better financial situation than Nicaragua to afford taking on this project in that it already has a stream of income from its existing canals.

Alternative motives have been explored and other projects have taken priority against the water transportation venture. Bloomberg reported in 2015 that "conspiracy theories abound" including the project was a land grab by Ortega, an attempt by Ortega to "whip up" support in elections, and part of a Chinese plan to gain influence in the region.

By November 2016, the president of the canal commission, Manual Coronel Kautz said "According to our schedule, we should initiate major works by the end of the year." However, Carlos Fernando Chamorro, editor of the Confidencial newspaper, said "If the People's Republic of China does not step forward, it won't happen. Wang Jing does not have the reputation to push this through. If it is just him, then the chances of this happening are zero. If the PRC steps in, then it is a big possibility."

Following financial difficulties, HKND finally closed its headquarters offices in China in April 2018, leaving no forwarding address or telephone numbers to be reached.

Opposition

Protests against the canal's construction occurred shortly after the official ceremony marking its beginning. Farmers feared it could cause their eviction and land expropriation.

The vast land expropriations (2,900 km2 (1,100 mi2)) under land expropriation Canal Law 840 enacted in 2013 include a concession for carrying out seven sub-projects, among them ports, oil pipelines, free-trade zones, and developing tourist areas that could be realized in any part of the national territory. In particular, this law denies any right to appeal against the expropriation decision and provides a derisory level of compensation. It also allows the investor (HKND) to buy and sell its rights over the various sub-projects "in parts", which is a highly profitable enterprise. This has been called a "land grab" and it has prompted protests, and some violent confrontations against security forces. Activists noted that the canal contract established that it must be dissolved in 72 months, if the investor has not obtained the money to start the project; that deadline was 14 June 2019, so they assert that the Law 840 must be repealed.

Opposition leader Eliseo Nuñez has called the deal "part of one of the biggest international scams in the world". Legal challenges that the deal violates constitutional rights were rejected by the Supreme Court of Nicaragua and a retrospective rewriting of the Constitution of Nicaragua placed HKND beyond legal challenge. HKND has been granted the right to expropriate land within 5 km (3.1 mi) on each side of the canal and pay only cadastral value, not market value, for property. Wang, however, promised to pay fair market value. The estimates of the number of people who would be displaced range from 29,000 to more than 100,000. There are indications of local opposition to intended expropriations. Thus, according to an activist leader, an unrest in Rivas in December 2014, in opposition to the canal, left two protesters dead, although no evidence was ever produced to justify his claim. The CIDH, Nicaragua's Human Rights Commission, has strongly criticized the government for not looking into the project's effect on citizens, amid claims that citizens were not involved in decision-making. The British firm ERM, who carried out the Environmental Impact Assessment, claims it held consultations with around 6,000 people in the communities along its planned route, and estimated that the property of about 30,000 people would be affected. National opinion polls show that support for the project is about 70%.

Reported end to the canal project

Investor Wang had financial setbacks unrelated to the Nicaragua project, losing 80% of his net worth during the 2015–16 Chinese stock market turbulence. In March 2017, the Havana Times reported that the public relations agency handling Wang's interests in Nicaragua had been let go, in absence of any developments on the project to report, and Wang had not been in the country in more than two years. In May 2017, the PanAm Post indicated that "no concrete action has been taken to begin the project" and suggested that the project was either "paralyzed, or nonexistent." In September 2017 Agence France-Presse reported that the work had been "pushed back indefinitely," although the government renewed the project's environmental permit in April 2017.

In February 2018, Manuel Coronel Kautz, head of Interoceanic Grand Canal Authority of Nicaragua, told Agence France-Presse work on the canal was still ongoing, but by that point analysts and activists widely viewed the canal project as defunct, with China having shifted its investment focus to Panama, the main competitor to a Nicaraguan canal. Following financial difficulties, HKND finally closed its offices in April 2018, leaving no forwarding address or telephone numbers to be reached.

Absent a 60% vote to revoke the legislation, HKND maintains the legal concessions established by the 2013 law, including for other infrastructures projects in Nicaragua, including ports, roads, railway and an airport.

In November 2024 the Nicaraguan Canal idea has been revived.