NorNed

Power cable between Norway and the Netherlands

  • 2 min read
  • 4 chapters

Explore on Lably

ToursExplore Lably’s 3D tours

History

Installation of the first sections started in early 2006 and the final section was laid by the end of 2007. On the Dutch shore, TenneT has connected the cable to the 380 kV Dutch high‑voltage grid. In Feda, Statnett has done the same for the 300 kV Norwegian transmission grid. Commercial operation started on 5 May 2008 with a capacity auction. The first commercial power transfer took place on 6 May 2008.

After two months of operation, the cable generated revenues of approximately €50 million. In the business case drawn up for the NorNed cable, annual revenues were estimated at €64 million.

NorNed has been included in European Market Coupling Company operations as of 12 January 2011. The internal grid in Norway is sometimes not capable of handling enough power for NorNed and Cross-Skagerrak, and capacity for these cables is then artificially limited.

The cable had a fault in 2011, causing 7 weeks out of operation.

A fault was discovered in May 2022, causing a shutdown of operations. Operations are expected to resume in October 2022.