Nuclear power in Indonesia

  • 7 min read
  • 6 chapters

Related on Lably

Through International Atomic Energy Agency, South Korea and Russia

The current legislation regulating the utilization, research, and development of nuclear power in Indonesia is Law No. 10/1997. With this law, the national nuclear energy regulatory and oversight agency, Badan Pengawas Tenaga Nuklir (BAPETEN, English: Nuclear Energy Regulatory Agency), was founded in 1998. While National Nuclear Energy Agency of Indonesia (Indonesian: Badan Tenaga Nuklir Nasional, BATAN) was the state nuclear research and development agency established in 1958 and revitalized through the law. Prior the 2021 science and technology reformation, BATAN took role as the state nuclear research and development agency. Since 2021, National Research and Innovation Agency (Indonesian: Badan Riset dan Inovasi Nasional, BRIN) is the state nuclear research and development agency after BATAN relinquished its power and rights to BRIN and liquidation of BATAN. BRIN exercise its role in execution of state nuclear research and development activities through its Research Organization for Nuclear Energy (Indonesian: Organisasi Riset Tenaga Nuklir, ORTN).

History

In 1954, research on atomic energy began in Indonesia. Apart from producing electricity, nuclear technology is also used for medical and agricultural purposes and for food safety. Plans for an atomic program were scaled back in 1997 due to the discovery of the Natuna gas field but have since revived since 2005.

According to Presidential Decree Five in 2006, Indonesia should have four nuclear-power plants built by 2025. Their total capacity will be at least 4,000 MW of electricity, about 1.96 percent of projected electricity demand in 2025 (200,000 to 350,000 MW). Indonesia has stated that the program will be developed in accordance with the International Atomic Energy Agency (IAEA), and Mohammed ElBaradei was invited to visit the country in December 2006. Protests against plans for nuclear power were held in June 2007 in central Java, and increased in mid-2007.

In December 2013 it was reported that Indonesia was planning to begin constructing a reactor in 2015. In February 2014 the Indonesian Government confirmed that it was planning to construct a 30MW reactor in the near future. However, as of December 2015, Indonesia will not resort to nuclear energy to meet its target of 136.7 gigawatt of power capacity by 2025 and 430 gigawatt by 2050.

In August 2016, CNEC and BATAN agreed to jointly develop a HTGR in Indonesia.

On 1 September 2021, BATAN dissolved and replaced by ORTN of BRIN.