Rødsand I

Rødsand I was built in 2003, with 72 turbines and a total capacity of 166 MW, and was the largest in the world until 2007. Annual production is some 570 GW·h, the equivalent to the electricity consumption of 140,000 Danish homes, which could save 500,000 tonnes of CO2 emissions. Turbines were installed by A2SEA. It receives 45 øre per kW·h for the first 42,000 full-load hours, which is about 11 years.

Rødsand I was out for 41⁄2 months in 2007 when the main transformer suffered a malfunction, causing a production loss of 23 million DKK per month.

In September 2010, DONG bought E.ON's 20% share and sold half of the entire project to pension fund PensionDanmark for 700 million kroner (€94 million / US$120 million) — almost half the DKK1,600 million cost. Stadtwerke Lübeck also owns a share.

As of 2013 it has an availability of 97 percent.