Through Tide, Agriculture and Holocene

The dam contains a large sluice, the Bergse Diepsluis, and is located adjacent to a pair of sluices at Kreekrak, where about 80,000 ships pass every year.

Design background

The Oesterdam was not originally part of the planned Delta Works, but rather is one of the compartmentalisation dams which became necessary when it was decided not to close off the Eastern Scheldt, but to provide it with a permeable barrier.

The reduced tidal movement in the estuary associated with this decision meant that, to achieve sufficient tidal movement, the surface area of the Eastern Scheldt would have to be reduced. This was achieved by the construction of compartmentalisation dams: the Markiezaatskade, the Philipsdam, the Volkerakdam, and the Oesterdam.

With the construction of the compartmentalisation works, the freshwater Volkerak-Zoommeer was created, with benefits for agriculture. At the same time, a tide-free shipping route was created from the Volkerak locks to Antwerp.

The Commissie Compartimentering Oosterschelde (English: Committee for Compartmentalisation of the Eastern Scheldt) was formed under the aegis of the Dutch Minister of Transport and Water Management. Its mandate included reporting to both the minister and the provincial authorities of Zeeland and North Brabant by 30 April 1975. This report was to cover the technical, planning, and financial considerations of various proposals for compartmentalising the Eastern Scheldt.

The necessity of this committee arose from the need to maintain a substantial tidal difference at Yerseke and to ensure tide-independent inland navigation between Antwerp and Rotterdam, in accordance with an existing treaty with Belgium. The committee evaluated multiple alternatives, each suggesting a unique design for the dam. The chosen plan for the Oesterdam entailed a path from the Scheldt-Rhine Canal through the Bathse polders in a northerly direction, incorporating a separate spillway channel leading to a sluice in the Western Scheldt – the Bathse sluice – along with enhancements to the Canal through South Beveland.

In the initial phases, the Bathse spillway channel's dam body was positioned west of the Kreekrak locks, intended to become operational concurrent with the completion of the Oesterdam. The proposed lock connecting the Zoommeer and the Eastern Scheldt was planned to be situated southwest of the Tholense Gap. This location was selected for its feasibility and its connection to an easily constructible section of the dam over the Speelmansplaten. This configuration resulted in two remaining gaps, the Marollegat and the Tholense Gap, that needed closure.