Lably
Skip to content

Operations and Checkout Building

  • 2 min read
  • 3 chapters

Related on Lably

Through International Space Station

Apollo program

During planning and construction, it was known as the Operations and Checkout Building. When it was finished in 1964, it was renamed the Manned Spacecraft Operations Building and was used to process spacecraft in the Gemini and Apollo era. It was reverted back to the Operations and Checkout Building during the Shuttle program, known informally as the O&C.

Altitude test chambers

In 1965, a pair of altitude chambers were installed in the High Bay for testing the environmental and life support systems of both the Apollo Command/Service Module and Lunar Module at simulated altitudes of up to 250,000 feet (76 km). Each chamber is 58 feet (18 m) high (with a clear working height of 28 feet (8.5 m)) and an interior diameter of 33 feet (10 m), were human-rated, and capable of reaching the maximum altitude (minimum pressure) in one hour. These were used by the prime and backup crews of all crewed missions, from the ill-fated Apollo 1 in October 1966, through to the Apollo-Soyuz Test Project in July 1975.

Sign in to keep reading

2 more chapters are free with a Lably account.

More in Optical, navigation and astronomical