Panipat Elevated Expressway
- 1 min read
- 1 chapters
Related on Lably
Through Panipat, Delhi and Build–operate–transfer
The expressway was built to ease the traffic on NH-1 (now NH-44, also known as the Grand Trunk Road) between Delhi and Amritsar. It is 10 kilometres (6.2 mi) long. This INR 4.22 billion build-operate-transfer (BoT) project has been executed by L&T Panipat Elevated Corridor Limited (L&T PECL), in a time period of 28 months at a cost of INR 325 crores. National Highways Authority of India had allotted a 20-year concession period (which started in January 2006) to L&T PECL to finance, design, build, operate and maintain this facility.
More in Early modern
Qing dynastyManchu-led dynasty of China (1644–1912)East India CompanyBritish joint-stock company (1600–1874)Ming dynastyImperial dynasty of China (1368–1644)American Revolutionary War1775–1783 conflict in North AmericaPrussiaGerman state from 1525 to 1947Kingdom of Great BritainSovereign state in Western Europe (1707–1801)

