Pearl GTL

Gas to liquids plant based in Ras Laffan, Qatar

  • 2 min read
  • 4 chapters

Related on Lably

Through Natural gas

Technical features

Upon achieving its full capacity in 2012, the Pearl GTL can convert 1.6 billion cubic feet per day (45×106 m3/d) of natural gas into 140,000 barrels per day (22,000 m3/d) of petroleum liquids and 120,000 barrels of oil equivalent (730,000 GJ) into natural gas liquids and ethane. The integrated process automation and control system for the main plant and the onplot tank farm were designed and implemented by Honeywell, while that for the offplot tank farm and the loading berths were designed and implemented by Invensys. Page Europa was contracted as overall Telecom System Integrator for both onshore and offshore telecommunications systems. ABB Group was contracted to supply all of the electrical and control systems. The first train started production in May 2011, followed by the second train in November 2011.

The main contractors were KBR and JGC Corporation. Other contractors were J. Ray McDermott, CB&I, Consolidated Contractors Company, Kentz, Descon Engineering Limited. The process pumps are supplied by Flowserve, chemical injection pumps are by LEWA Germany and eight turbomachinery trains for use in the air separation systems are supplied by Linde. Half of the 24 reactors for the Fischer–Tropsch process were supplied by MAN AG.

The Pearl GTL project built upon the foundations of the smaller scale GTL project in Bintulu, Malaysia, which has been in operation since 1993. The plant reached full production in mid-2012.

Sign in to keep reading

3 more chapters are free with a Lably account.

More in Energy