Petroleum industry in Sudan

  • 7 min read
  • 2 chapters

Related on Lably

Through Agriculture, Transport and Household

1970s-1980s

Prior to the discovery of oil, roughly 80 percent of the nation's energy requirement for industry, modern agriculture, transportation, government services, and households (in addition to fuelwood, charcoal, and the like) came from imported petroleum and petroleum products. Approximately 10 percent of those imports were used to generate electricity. Foreign-exchange costs for oil imports rose dramatically after 1973. The discovery of domestic petroleum deposits at the end of the 1970s and during the early 1980s thus promised to—and eventually did—lessen the dependence on expensive external sources.

The search for oil began in 1959 in the Red Sea littoral and continued intermittently into the 1970s. In 1974 the U.S. firm Chevron began exploration in southern and southwestern Sudan. Drilling began in 1977, and the first commercial flow started in July 1979 at Abu Jabrah in South Darfur. In 1980 major finds occurred at the company’s Unity Field near Bentiu; by early 1981, drilling had brought in 49 wells having a combined flow of more than 12,000 barrels per day (b/d). Other oil companies—including some from the United States, Canada, and France—also obtained concessions, and by 1982 almost one-third of Sudan had been assigned for exploration. Oil exploration and production were hampered, however, by the almost total lack of infrastructure and by the civil war in the South.

The domestic processing of crude petroleum began in late 1964, when the Port Sudan oil refinery went into operation. The refinery, which was financed, built, and managed by the British Petroleum and Royal Dutch Shell companies—from July 1976 as a joint-equal shareholding project with the government—had a capacity of about 21,440 barrels per day. Its capacity was well in excess of Sudan's needs at the time it was built, and refined products were exported. As domestic demand increased in the 1980s, and with new petroleum discoveries, several plans were developed for a new oil refinery and an export pipeline. By 1986, however, those plans had been cancelled. Sudan had to import both gas oil (used in diesel motors and for heating) and kerosene for domestic use, although a substantial quantity of other products refined by the plant, in excess of Sudan’s own needs, continued to be exported.

Further seismic studies were undertaken in the swamps of Al-Sudd, but all of Chevron's exploration and development activities came to an abrupt end in February 1984, when rebels attacked the main Chevron base across the Bahr al-Ghazal from Bentiu, killing four Chevron employees. The company immediately terminated its development program and, despite repeated demands by successive Sudanese governments, refused to return to work its concession until the safety of its personnel could be guaranteed by a settlement of the Sudanese civil war. Total, the French oil company, shut down its operations several months later.