Prelude FLNG

Floating liquefied natural gas platform

  • 4 min read
  • 3 chapters

Related on Lably

Through Joint venture, South Korea and Competition (economics)

It is 488 metres (1,601 ft) long, 74 metres (243 ft) wide, 105 m (344 ft) tall, and made with more than 260,000 tonnes of steel, beating Seawise Giant (the previous record holder) as the world's longest vessel. The vessel displaces around 600,000 tonnes when fully loaded, more than five times the displacement of a Nimitz-class aircraft carrier. It is the world's largest FLNG platform, as well as the largest FLNG facility constructed to date.

Construction

The main double-hulled structure was built by the Technip Samsung Consortium in the Samsung Heavy Industries Geoje shipyard in South Korea. Construction was officially started when the first metal was cut for the substructure in October 2012. The Turret Mooring System was subcontracted to SBM and built in Drydocks World Dubai, United Arab Emirates. The MEG (monoethylene glycol) reclamation unit by Fjords Processing Norway and built in South Korea is the only topside module subcontracted. Other equipment such as subsea wellheads were constructed at other locations around the world. It was launched on 30 November 2013 with no superstructure (accommodation and process plant). The vessel is moored by its turret to 16 seabed driven steel piles, each 65 m (213 ft) long and 5.5 m (18 ft) in diameter.

Subsea equipment was built by FMC Technologies, and Emerson is the main supplier of automation systems and uninterruptible power supply systems. By July 2015, all 14 gas plant modules were installed.

Sign in to keep reading

2 more chapters are free with a Lably account.

More in Energy