Lably
Skip to content

Rail Splitter Wind Farm

Wind farm in Illinois, United States

  • 1 min read
  • 1 chapter

Related on Lably

Through Watt

Operation

The turbines generate a maximum of 100.5 megawatts of electricity. The wind farm is owned and operated by EDP Renewables North America (EDPR NA), formerly Horizon Wind Energy. The wind turbines that constitute the farm are centered on the town of Emden on both sides of Interstate 155. The wind farm, constructed in 2008–2009 at a cost of $200.0 million, was dedicated on July 21, 2009.

Expansion

Rail Splitter II is a wind farm that will be located in Tazewell County, near the townships of Boynton, Hopedale, Hittle, and Little Mackinaw. The expansion will add capacity of 100 megawatts (MW) with 20-28 planned turbines. The model is expected to be determined in 2023.

In June 2022, a group of Mackinaw farmers known as United Citizens of Tazewell County LLC presented a rewrite of the county ordinance for wind farms. If passed, this change would affect the turbines at Rail Splitter and the proposed Rail Splitter II.

More in Energy