Through Hydroelectricity

The river is crossed by three bridges, and is the site of a hydro-electric power station, built as part of the first constructional scheme promoted by the newly-formed North of Scotland Hydro-Electric Board, to demonstrate its commitment to supplying the remote areas of Scotland with electricity. It was commissioned in 1948.

Course

The course of the River Morar is about 0.5 miles (0.8 km) long from Loch Morar to below the bridge carrying the A830 trunk road, and is one of the shortest rivers in Scotland. However, when the tide is out, it flows in a single channel across the sands of Morar Bay, for another 1.5 miles (2.4 km), and this section is labelled River Morar by the Ordnance Survey. The surface level of Loch Morar is 46 feet (14 m) above Ordnance datum (AOD), and the river descends through this height to reach the sea at the Sound of Sleet.

At the top end of the river, there are a series of jetties on the right bank, which provide moorings for boats using the loch. The river heads south, and then turns to the west. A weir and sluice control the flow to the hydroelectric station on the left bank. The river then tumbles down a rocky section, known as the Falls of Morar, although the flow down the falls is considerably less than it was before the hydroelectric plant was built. The power station discharges its water back into the river below the main part of the falls, and a fish ladder allows salmon and trout to negotiate the rise to reach Loch Morar.

The river is crossed by three bridges, the upper most of which is a railway viaduct built by the West Highland Railway which opened its route from Banavie to Mallaig in 1901. The viaduct consists of four arches, is made of massed concrete, and was completed in 1897. It now carries the West Highland Line and is a Category B listed building. The main arch spanning the river is 90 feet (27 m), a second smaller arch carries the railway over the road on the north side of the river, and there are arches at both ends which are smaller still. The second bridge carries the B8008 road which runs through the village of Morar. It was formerly part of the main road from Fort William to Mallaig. The present bridge is close to the railway viaduct, and is built of stone. Prior to 1915, the road bridge was a little further downstream, but was replaced at some point. The newer bridge is the normal upstream limit to which tides flow. The third bridge carries the A830 road, and was constructed in 1997 when the road was upgraded. It bypasses the village altogether.

Below the road bridge, the river channel is flanked by white sandy beaches at low tide, known as the Silver Sands of Morar. The River Morar forms the boundary between the parishes of Glenelg, to the north, and Arisaig and Moidart, to the south.