Roller-compacted concrete

Concrete blend used in dam construction

  • 3 min read
  • 2 chapters

Related on Lably

Through Concrete and Sulfuric acid

In dam construction, roller-compacted concrete began its initial development with the construction of the Alpe Gera Dam near Sondrio in North Italy between 1961 and 1964. Concrete was laid in a similar form and method but not rolled. RCC had been touted in engineering journals during the 1970s as a revolutionary material suitable for, among other things, dam construction. Initially and generally, RCC was used for backfill, sub-base and concrete pavement construction, but increasingly it has been used to build concrete gravity dams because the low cement content and use of fly ash cause less heat to be generated while curing than do conventional mass concrete placements. Roller-compacted concrete has many time and cost benefits over conventional mass concrete dams; these include higher rates of concrete placement, lower material costs and lower costs associated with post-cooling and formwork.

Dam applications

For dam applications, RCC sections are built lift-by-lift in successive horizontal layers resulting in a downstream slope that resembles a concrete staircase. Once a layer is placed, it can immediately support the earth-moving equipment to place the next layer. After RCC is deposited on the lift surface, small dozers typically spread it in one-foot-thick (about 30 cm) layers.

The first RCC dam built in the United States was the Willow Creek Dam on Willow Creek, a tributary in Oregon of the Columbia River. It was constructed by the US Army Corps of Engineers between November 1981 and February 1983. Construction proceeded well, within a fast schedule and under budget (estimated US$50 million, actual US$35 million). On initial filling though, it was found that the leakage between the compacted layers within the dam body was unusually high. This condition was treated by traditional remedial grouting at a further cost of US$2 million, which initially reduced the leakage by nearly 75%; over the years, seepage has since decreased to less than 10% of its initial flow. Concern over the dam's long-term safety has continued however, although only indirectly related to its RCC construction. Within a few years of construction, problems were noted with stratification of the reservoir water, caused by upstream pollution and anoxic decomposition, which produced hydrogen sulfide gas. Concerns were expressed that this could in turn give rise to sulfuric acid, and thus accelerate damage to the concrete. The controversy itself, as well as its handling, continued for some years. In 2004 an aeration plant was installed to address the root cause in the reservoir, as had been suggested 18 years earlier.

In the quarter century following the construction of the Willow Creek Dam, considerable research and experimentation yielded many improvements in concrete mix designs, dam designs and construction methods for roller-compacted concrete dams. By 2008, about 350 RCC dams existed worldwide. As of 2018, the highest dam of this type was the Gilgel Gibe III Dam in Ethiopia, at 250 m (820 ft), with the Pakistani Diamer-Bhasha Dam under construction at 272 m (892 ft).