Sabah–Sarawak Gas Pipeline

Natural gas pipeline in Malaysia

  • 2 min read
  • 1 chapter

Related on Lably

Through Natural gas

History

The pipeline was constructed in 2011 with a total of RM4.6 billion (US$1 billion) been allocated to complete the project.

Gas leak incidents (2014–2022)

There have been four reported gas leaks along the line, two resulting explosions. On 11 June 2014, the pipeline located in between Lawas and Long Sukang in Sarawak exploded that caused the temporary shutdown of the line. No casualties were reported in the incident. On 10 January 2018, the line along Long Luping of Lawas District in Limbang Division was leaked although no impact to surrounding communities and environment are being reported. In the early morning of 13 January 2020, there was another explosion which resulted in a fire in the vicinity of the Penan village of Long Selulong, Ulu Baram, Sarawak. On 21 September 2022, a pipeline leak in the vicinity of KP201 due to soil movement which resulted to a safety shutdown on the gas supply. On 17 November 2022, a pipeline located in Long Ugui, Lawas, exploded. One casualty and two injuries were reported in the incident.

Lawas to Bintulu pipeline decommissioned process (2025–2027)

On 28 January 2025, Petronas announced the decommissioning of the pipeline of Lawas, Limbang, Miri, and Bintulu that will be done in stages and set to be completed before 2027 due to the unstable geographic location of the pipeline location with frequent soil movement and subsidence that frequently causes gas leaks. The decommissioning plans include the plugging and abandonment of approximately 153 wells and the abandonment of about 37 offshore facilities and one onshore facility, which is the pipeline.