Lably
Skip to content

Scaffolding

Temporary structure used to support a work crew and materials

  • 13 min read
  • 4 chapters
Aneur scaffold with stair and crosswalk.
Felalo · CC BY-SA 4.0

Related on Lably

Through Building, Paleolithic and Cave painting

There are six main types of scaffolding used worldwide today. These are tube and coupler (fitting) components, prefabricated modular system scaffold components, H-frame / façade modular system scaffolds, suspended scaffolds, timber scaffolds and bamboo scaffolds (particularly in China, India and Hong Kong). Each type is made from several components which often include:

  • A base jack or plate which is a load-bearing base for the scaffold.
  • The standard, the upright component with connector joins.
  • The ledger, a horizontal brace.
  • The transom, a horizontal cross-section load-bearing component which holds the batten, board, or decking unit.
  • Brace diagonal and/or cross section bracing component.
  • Batten or board decking component used to make the working platform.
  • Coupler, a fitting used to join components together.
  • Scaffold tie, used to tie in the scaffold to structures.
  • Brackets, used to extend the width of working platforms.

Specialized components used to aid in their use as a temporary structure often include heavy duty load bearing transoms, ladders or stairway units for the ingress and egress of the scaffold, beams ladder/unit types used to span obstacles and rubbish chutes used to remove unwanted materials from the scaffold or construction project.

History

Stone Age

Sockets in the walls around the Paleolithic cave paintings at Lascaux, suggest that a scaffold system was used for painting the ceiling, over 17,000 years ago.

Antiquity

The Berlin Foundry Cup depicts scaffolding in ancient Greece (early 5th century BC). Egyptians, Nubians and Chinese are also recorded as having used scaffolding-like structures to build tall buildings. Early scaffolding was made of wood and secured with rope knots.

Modern era

Scaffolding was erected by individual firms with wildly varying standards and sizes. The process was revolutionized by Daniel Palmer Jones and David Henry Jones. Modern day scaffolding standards, practices and processes can be attributed to these men and their companies: Rapid Scaffold Tie Company Ltd, Tubular Scaffolding Company and Scaffolding Great Britain Ltd (SGB).

David Henry Jones and Daniel Palmer Jones patented the "Scaffixer" in either 1907 or 1910, a coupling device far more robust than rope which revolutionized scaffolding construction. In 1913, his company was commissioned for the reconstruction of Buckingham Palace, during which his Scaffixer gained much publicity. Palmer-Jones followed this up with the improved "Universal Coupler" in 1919 - this soon became the industry standard coupling and has remained so to this day.

Advancements in metallurgy throughout the early 20th century saw the introduction of tubular steel water pipes (instead of timber poles) with standardized dimensions, allowing for the industrial interchangeability of parts and improving the structural stability of the scaffold. The use of diagonal bracings also helped to improve stability, especially on tall buildings. The first frame system was brought to market by SGB in 1944 and was used extensively for the postwar reconstruction.

Sign in to keep reading

3 more chapters are free with a Lably account.

More in Infrastructure