Serenje Solar Power Station
Solar farm in Zambia
- 1 min read
- 4 chapters
Explore on Lably
ToursExplore Lably’s 3D toursLocation
The power station would be located in Kosamu Village, in Chief Kabamba’s Area, in Chitambo District, in Zambia's Central Province. The solar farm would sit on 448 hectares (1,107 acres) of land.
Sign in to keep reading
3 more chapters are free with a Lably account.
Overview
Serenje Solar Power Station is designed to have capacity of 200 megawatts. Its output is expected to be sold directly to the Zambia Electricity Supply Corporation (ZESCO). The long-term power purchase agreement (PPA) governing that transaction had not been signed yet, but was anticipated, as of July 2021. A new high voltage transmission power line will be constructed to convey the energy from the solar farm to the Zesco substation at Pensulo, where the power will enter the national electricity grid.
Developers
The power station is being developed by an American IPP, by the name of Ultra Green Corporation Inc., thorough its wholly owned Zambian subsidiary, Ultra Green Corporation Zambia Limited. The Zambian subsidiary has obtained a license to design, fund, build and operate the solar farm.
Construction costs, and commissioning
The construction costs have been budgeted at US$336 million. This investment would cover $216 million to develop the solar farm and another $120 million to construct the high voltage power line from Kosamu Village to Pensulo's ZESCO substation. The project has already created 465 jobs at the construction site. Construction is expected to start in September 2021, with commercial commissioning anticipated 15 to 18 months later.

