Shearon Harris Nuclear Power Plant

Nuclear power plant located in New Hill, North Carolina

  • 5 min read
  • 4 chapters

Related on Lably

Through Watt and Electric generator

The Shearon Harris site was originally designed for four reactors (and still has the space available for them), but only one was built. The final cost approached $3.9B, including safety upgrades mandated after the Three Mile Island accident.

On November 16, 2006, the operator applied to the Nuclear Regulatory Commission (NRC) for a renewal and extension of the plant's operating license. The NRC granted the renewal on December 17, 2008, extending the license from forty years to sixty.

History

Refurbished generator from Three Mile Island

On January 22, 2010, officials at the Nuclear Regulatory Commission announced the electrical generator from the damaged Unit 2 reactor at Three Mile Island would be used at Shearon Harris. The generator was refurbished and installed during a refueling outage in November, 2010.

Units 2 and 3

On February 19, 2008 Progress filed an application with the Nuclear Regulatory Commission (NRC) for a Combined Construction and Operating License (COL). It seeks to build two 1,100 MWe Westinghouse AP1000 pressurized water reactors. Although the NRC had already certified the AP1000 design, the application review was expected to take about 36 months. The new reactors would not be operational before 2018.

Expansion of the plant would require raising the water level of Harris Lake by 20 feet, decreasing the size of Wake County's largest park, with the Cape Fear River as a backup water source.

On May 2, 2013, Duke submitted a request to the NRC to suspend review of the Harris Units 2 and 3 Combined License Application (COLA), effectively halting further development of this project. Duke has determined the forecast operating dates of the proposed reactors falls outside the fifteen-year planning horizon utilized by state regulators in their demonstration of need evaluation. The COLA remains docketed, however, leaving the door open for Duke to restart activities.