Lably
Skip to content

Shenzhen Metro

Rapid transit system in China

  • 25 min read
  • 12 chapters
Photo of Shenzhen Metro Line 3 Buji Station
Jxnp · CC BY-SA 4.0

Related on Lably

Through China

Current system

Currently the network has 642 kilometres (399 miles) of route, operating on 17 lines with 432 stations. Line 1, Line 4 and Line 10 run to the border crossings between the Shenzhen Special Economic Zone and the Hong Kong Special Administrative Region at Luohu/Lo Wu and Futian Checkpoint/Lok Ma Chau, where riders can transfer to Hong Kong's MTR East Rail line for travel onwards to Hong Kong.

Year-end urban-rail operating length reported for Shenzhen by CAMET, separating the metro series from the all-mode city total where both are reported.

Raw operating-length data

Line 1

Line 1, formerly known as Luobao line, runs westward from Luohu to Airport East. Trains operate every 2 minutes during peak hours and every 4 minutes at other times.

  • December 28, 2004: Luohu – Window of the World
  • September 28, 2009: Window of the World – Shenzhen University
  • June 15, 2011: Shenzhen University – Airport East

Line 2

Line 2, formerly known as Shekou line, runs from Chiwan to Liantang. Line 2 is connected with Line 8 at Liantang station.

  • December 28, 2010: Chiwan – Window of the World
  • June 28, 2011: Window of the World – Xinxiu
  • October 28, 2020: Xinxiu – Liantang

Line 3

Line 3, formerly known as Longgang line, runs from Futian Bonded Area to Pingdi Liulian in Longgang, in the north-east part of the city. Construction began on December 26, 2005. The line is operated by Shenzhen Metro Line 3 Operations, which has been a subsidiary of SZMC (Shenzhen Metro Group) since April 11, 2011, when an 80% stake was transferred to SZMC.

  • December 28, 2010: Caopu – Shuanglong
  • June 28, 2011: Yitian – Caopu
  • October 28, 2020: Futian Bonded Area – Yitian
  • December 28, 2024: Shuanglong – Pingdi Liulian

Line 4

Line 4, formerly known as Longhua line, runs northward from Futian Checkpoint to Niuhu. Trains operate every 2.5 minutes at peak hours and every 6 minutes during off-peak hours. Stations from Futian Checkpoint to Shangmeilin Station are underground. The line has been operated by MTR Corporation (Shenzhen), a subsidiary of MTR Corporation, since July 1, 2010.

  • December 28, 2004: Fumin – Children's Palace
  • June 28, 2007: Futian Checkpoint – Fumin
  • June 16, 2011: Children's Palace – Qinghu
  • October 28, 2020: Qinghu – Niuhu

Line 5

Line 5, formerly known as Huanzhong line, runs from Chiwan in the west to Grand Theater in the east via an arch-like shape. Construction began in May 2009 and the line opened on June 22, 2011. Line 5 required a total investment of 20.6 billion RMB. The line is operated by SZMC (Shenzhen Metro Group).

  • June 22, 2011: Qianhaiwan – Huangbeiling
  • September 28, 2019: Qianhaiwan – Chiwan
  • December 28, 2025: Huangbeiling – Grand Theater

Line 6

Line 6, formerly known as Guangming line, runs from Songgang in the north to Science Museum in the south, with a length of 49.4 km (30.7 mi) and a total of 27 stations. Construction began in August 2015 and the line opened on August 18, 2020.

  • August 18, 2020: Science Museum – Songgang

Line 6 Branch

Line 6 Branch, also known as Branch Line 6, runs from Guangmingcheng to SUAT in the north. The line opened on November 28, 2022.

  • November 28, 2022: Guangming – SUAT
  • September 28, 2025: Guangmingcheng – Guangming

Line 7

Line 7, formerly known as Xili line of the Shenzhen Metro, opened on October 28, 2016, with a length of 32.84 km (20.41 mi) and a total of 29 stations. It connects SZU Lihu Campus at Shenzhen University to Tai'an. The line travels East–West across Shenzhen in a "V" shape.

  • October 28, 2016: Xili Lake – Tai'an
  • December 28, 2024: SZU Lihu Campus – Xili Lake

Line 8

Line 8, formerly known as Yantian line of the Shenzhen Metro, opened on October 28, 2020, with a length of 20.377 km (12.662 mi) and a total of 11 stations. It connects the eastern suburbs of Liantang to Yantian Road, then towards the beach resorts at Dameisha, Xiaomeisha before entering Dapeng at the beach resort at Xichong. However, this line serves as the extension of Line 2 in actual operation.

  • October 28, 2020: Liantang – Yantian Road
  • December 27, 2023: Yantian Road – Xiaomeisha
  • December 28, 2025: Xiaomeisha – Xichong

Line 9

Line 9, formerly known as Meilin line or Neihuan line of the Shenzhen Metro, opened on October 28, 2016. The line runs eastward from Qianwan to Wenjin. It has 10 transfer stations. The line is 36.18 km (22.48 mi) long, running through the districts of Nanshan, Futian and Luohu.

  • October 28, 2016: Hongshuwan South – Wenjin
  • December 8, 2019: Qianwan – Hongshuwan South

Line 10

Line 10 formerly known as Bantian line, runs from Futian Checkpoint in the south to Shuangyong Street in the north, with a length of 29.3 km (18.2 mi) and a total of 24 stations. Construction began in September 2015 and the line opened on August 18, 2020.

  • August 18, 2020: Futian Checkpoint – Shuangyong Street

Line 11

Line 11, also known as the Airport Express, runs from Bitou in the northwest to Hongling South in the city centre via Shenzhen Bao'an International Airport. Construction began in April 2012 and the line opened on June 28, 2016. Line 11 runs at a higher speed of 120 km/h (75 mph).

  • June 28, 2016: Bitou – Futian
  • October 28, 2022: Futian – Gangxia North
  • December 28, 2024: Gangxia North – Huaqiang South
  • December 28, 2025: Huaqiang South – Hongling South

Line 12

Line 12, also known as Nanbao Line, runs from Zuopaotai East in the southwest to Songgang in the northwest. Construction began in 2018 and the line opened on November 28, 2022.

  • November 28, 2022: Zuopaotai East – Waterlands Resort East
  • December 28, 2024: Waterlands Resort East – Songgang

Line 13

Line 13, also known as Shiyan Line, runs from Shenzhen Bay Checkpoint at the Shenzhen Bay Port in Nanshan to Lisonglang in northeast Guangming. Construction began in 2018 and the first phase of the line between Shenzhen Bay Checkpoint and Hi-Tech Central opened on December 28, 2024. Like Line 4, Line 13 is operated by MTR Corporation (Shenzhen).

  • December 28, 2024: Shenzhen Bay Checkpoint – Hi-Tech Central
  • December 28, 2025: Hi-Tech Central – Shangwu
  • June 28, 2026: Shangwu – Lisonglang

Line 14

Line 14, also known as the Eastern Express, runs from Gangxia North in the city centre to Shatian in the northeast. Construction began in 2018 and the line opened on October 28, 2022.

  • October 28, 2022: Gangxia North – Shatian

Line 16

Line 16, also known as Longping Line, runs from Yuanshan Xikeng in the south of Longgang to Tianxin in the northeast. Construction began in 2018 and the line opened on December 28, 2022.

  • December 28, 2022: Universiade – Tianxin
  • September 28, 2025: Yuanshan Xikeng – Universiade

Line 20

Line 20, formerly known as Fuyong line, runs from Airport North in the north-west to Convention & Exhibition City near Shenzhen World. Construction began in September 2016 and the line opened on December 28, 2021. Line 20 runs at the same top speed as line 11, at 120 km/h (75 mph).

  • December 28, 2021: Airport North – Convention & Exhibition City

Sign in to keep reading

11 more chapters are free with a Lably account.

More in Transportation