Lably
Skip to content

Sihwa Lake Tidal Power Station

Dam in Sihwa Lake, Gyeonggi Province

  • 1 min read
  • 4 chapters

Related on Lably

Through Watt, Turbine and Tide

Design

The tidal barrage makes use of a seawall constructed in 1994 for flood mitigation and agricultural purposes. Ten 25.4 MW submerged bulb turbines are driven in an unpumped flood generation scheme; power is generated on tidal inflows only, and the outflow is sluiced away, i.e. as one-way power generation. This slightly unconventional and relatively inefficient approach has been chosen to balance a complex mix of existing land use, water use, conservation, environmental and power generation considerations.

The station's mean operating tidal range is 5.6 m (18 ft), with a spring tidal range of 7.8 m (26 ft). The working basin area was originally intended to be 43 km2 (17 sq mi) and has been reduced by land reclamation and freshwater dykes to 30 km2 (12 mi2), likely to be reduced further.

Sign in to keep reading

3 more chapters are free with a Lably account.

More in Environment