Lably
Skip to content

Sleipner A

Offshore platform in the Norwegian sector of the North Sea

  • 3 min read
  • 4 chapters

Related on Lably

Through Carbon dioxide, Pump and Stress (mechanics)

It is known for its catastrophic failure during construction on 23 August 1991, due to a design flaw, that resulted from an error caused by unconservative concrete codes and inaccurate finite element analysis modelling of the tricell, which formed part of the ballasting/flotation system.

Location

Sleipner A is located on the Sleipner East gas field on the North Sea. Also six satellite fields–Gungne, Loke, Alpha North, Sigyn, Volve and Volve South–are tied-back to Sleipner A. In addition to its own operations, the platform is used as a remote operation center for the Sleipner B wellhead platform. The Sleipner B is operated from the Sleipner A via an umbilical cable. In addition, the Sleipner T carbon dioxide treatment platform is linked physically to the Sleipner A platform by a bridge.

Sign in to keep reading

3 more chapters are free with a Lably account.

More in Energy