Through Reservoir, Labrador and Control flow

With an area of 6,527 km2 (2,520 sq mi), is the largest body of freshwater in the province and the fifth-largest reservoir in the world in terms of surface area.

History

The earliest evaluation of hydro potential of this vast reservoir was in 1942 when H.G. Acres Company carried out a study for the Aluminum Company of Canada (Alcan). Due to the remoteness of the site then, it was considered too expensive to build and deemed not viable.

With the development of technologies for transmission of electricity over long distances the project design to build the power development including the main dam and control structure and the many dykes began in July 1967 by Acres Canadian Bechtel of Churchill Falls, a joint venture formed by Canadian Bechtel and Acres Engineering, as part of the construction of the Churchill Falls Generating Station.

Sign in to keep reading

2 more chapters are free with a Lably account.

More in Physical