ToursExplore Lably’s 3D toursIn 2023, the country's Minister of Energy, Csaba Lantos, predicted Hungary's target for 6,000 MW of PV capacity by 2030 would likely be exceeded twice over, hitting 12,000 MW instead. 2024 statistics confirmed the previous 6,000 MW by 2030 target was exceeded six years early, with PV capacity rising to 7,550 MW and solar power producing a record 24.8% of national electricity generation - the highest in the EU.
Installed capacity
Sign in to keep reading
One more chapter is free with a Lably account.
List of photovoltaic power stations
- Photovoltaic power stations (<10MWp)
- Csepreg - 5.5MWp
- Vép - 4.5MWp
- Monor - 4MWp
- Sajóbábony - 0.5MWp
- Bojt - 0.499MWp
- Sellye
- Szombathely - 0.385MWp
Under construction and proposed solar parks
- MOL Solar Parks; Füzesgyarmat, Tiszaújváros and Százhalombatta 18.38 MW (second half of 2019)
- Alteo Solar Parks; Balatonberény and Nagykőrös 7-7 MW (2019 June)
- Photon Energy Solar Pakrs; Fertőd 0.5 MW, Almásfüzitő 5.5 MW and Tiszakécske 5.5 MW (second half of 2019)
- Solar Markt Solar Pakrs; Söjtör 3.1 MW, and Kőszeg 3.9 MW (second half of 2019)
Biggest owners
- MVM Group:
- More than 5 MWp: Felsőzsolca, Paks, Pécs, Visonta
- Less than 5 MWp:
- MET Power: Százhalombatta
- Solar Markt: Csepreg, Kőszeg, Söjtör, Vép
- ALTEO Group: Balatonberény (7 MWp), Nagykőrös (7 MWp), Monor (4 MWp)
- SolServices Kft: Szolnok (138 MWp), Szászberek (68 MWp ),
More in Environment
Jimmy CarterPresident of the United States from 1977 to 1981United Nations Environment ProgrammeUN environmental response agencyVulnerable speciesIUCN conservation categorySurface runoffFlow of excess rainwater not infiltrating in the ground over its surfaceCritically endangeredIUCN conservation categoryGerald FordPresident of the United States from 1974 to 1977