ToursExplore Lably’s 3D toursBackground
It is the first ultra high-voltage project implemented by the Northwest China Grid Company, a subsidiary of the State Grid Corporation of China. Construction started on 13 May 2012. It went into operation in January 2014. Expected cost was 23.4 billion yuan.
Sign in to keep reading
2 more chapters are free with a Lably account.
Design
The line was designed and built by several different Chinese companies. Converter transformers and components were supplied by ABB, by XD Group, and by Siemens.
Operation
The transmission line starts at the Hami Nanhu converter station next to the Dananhu Power Station in Xinjiang and runs through Xinjiang, Gansu, Shaanxi, Ningxia, Shanxi and Henan provinces to Zhengzhou converter station in Henan. Its total length is 2,210 kilometres (1,370 mi). The line operates at ±800 kV voltage and is designed to have a transmission capacity of 8,000 MW, the highest in the world.
Coordinates
- Hami converter station 42°35′20″N 93°27′46″E / 42.58889°N 93.46278°E
- Zhengzhou converter station 34°48′46″N 114°03′24″E / 34.81278°N 114.05667°E