Trans-Australian Railway

Railway between Port Augusta and Kalgoorlie in Australia

  • 8 min read
  • 7 chapters
Map of the Trans-Australian Railway within the Sydney-Perth rail corridor
SCHolar44 at Wikipedia · CC0

Related on Lably

Through Australia, World War I and Water treatment

The inaugural passenger train service was known as the Great Western Express; later, it became the Trans-Australian.

Until 1970, the Trans-Australian Railway linked to pre-existing 1067 mm (3 ft 6 in) narrow-gauge lines at each end. With the completion of a standardisation project in that year, it became a component of the 4352 kilometres (2704 miles) Sydney–Perth rail corridor. As of 2024, two passenger services use the line, both of them experiential tourism services: the Indian Pacific for the entire length of the railway, and The Ghan between Port Augusta and Tarcoola, where it leaves the line to proceed north to Darwin.

History

In 1901, the six Australian colonies federated to form the Commonwealth of Australia. At that time, Perth, the capital of Western Australia, was isolated from the remaining Australian states by thousands of kilometres of desert terrain and the only practicable method of transport was by sea. The voyage across the notoriously rough Great Australian Bight was time-consuming, inconvenient and often uncomfortable. One of the inducements held out to Western Australians to join the new federation was the promise of a federally funded railway line linking Western Australia with the rest of the continent.

In 1907, legislation was passed, allowing for the route to be surveyed. The survey, completed in 1909, endorsed a route from Port Augusta (the existing railhead at the head of Spencer Gulf in South Australia's wheatfields) via Tarcoola to the gold mining centre of Kalgoorlie in Western Australia, a distance of 1,063 miles (1,711 km). The line was to be built to the standard gauge of 4 ft 8+1⁄2 in (1,435 mm), even though the state railway systems at both ends were narrow gauge at the time. Its cost was estimated at £4,045,000, equivalent to A$642 million in 2022.

Legislation authorising the construction was passed in December 1911 by the Fisher Commonwealth Government. Work commenced in September 1912 in Port Augusta.

Work proceeded eastwards from Kalgoorlie and westwards from Port Augusta through the years of the First World War. Tracklaying proceeded briskly when materials were available. At its peak, up to 2+1⁄2 miles (4.0 km) of track were laid each day, and 442 miles (711 km) were completed in one calendar year – both Australian tracklaying records. By 1915, the two ends of the line were just over 600 miles (966 km) apart with materials being delivered daily. Construction progressed steadily as the line was extended through mainly dry and desolate regions until the two halves of the line met at Ooldea on 17 October 1917.

Under the aegis of the federal department of transport, the Commonwealth Railways was established in 1917 to operate the line. Once passenger trains started to run, maintenance staff found that the high mineral salt content of bore water available along the route was playing havoc with steam locomotive boilers: repairs to boilers at one time accounted for an extraordinary 87 per cent of all locomotive maintenance. The problem was only arrested with the introduction of barium carbonate water treatment plants at watering points.

In 1937, the eastern end was extended 90 kilometres (56 miles) south to Port Pirie. Soon afterwards, the South Australian Railways extended its 1,600 mm (5 ft 3 in) broad-gauge line 47 km (29 mi) north to Port Pirie from Redhill. These two projects made redundant the indirect 290 kilometres (180 miles), 1,067 mm (3 ft 6 in) narrow-gauge connection from Terowie via Peterborough and Quorn, resulting in a much shorter and more comfortable journey to Adelaide. These two projects eliminated one break of gauge in the journey across Australia, but they turned Port Pirie Junction yard into a complex three-gauge facility. Railway engineers, however, were able to construct the new yards with no more than minimal dual-gauge track and the complex signalling that would have been incurred.

The long-anticipated conversion of the entire line between Sydney and Perth to standard gauge occurred in 1970.

In 2004, the gap in standard gauge connections between the mainland state capitals was finally closed with a connection between Port Pirie and Adelaide, thence Melbourne, and by completion of the northern component of the Adelaide–Darwin railway line, which diverges from the Trans–Australian Railway at Tarcoola.

In 2008, the engineering heritage of the railway was recognised by the Engineering Heritage Recognition Program of Engineers Australia when markers were installed on the platform at the Port Augusta station in South Australia and the ticket office at Kalgoorlie station in Western Australia.

On 17 October 2017, centenary celebrations were held at Ooldea.