Lably
Skip to content

Trans-Mediterranean Pipeline

  • 2 min read
  • 4 chapters

Related on Lably

Through Italy

History

The pipeline from Algeria to Italy was proposed in 1960s. A preliminary feasibility study was conducted in 1969 and the first route survey in 1970. In 1974–75, technical tests of laying pipes in the Mediterranean Sea were carried out. In 1977, supply and transit agreements were signed.

The first phase of pipeline was constructed in 1978–1983 and second phase in 1991–1994. The capacity of the pipeline was doubled in 1994. In 2000, the gas pipeline was named after Enrico Mattei. In the fall of 1997, a terrorist attack severed the pipeline in Algeria for five days.

On February 28, 2010, a new 549-kilometre (341 mi) section was completed in Bir El Ater, Tebessa Province, which was expected to increase transport capacity by 7 billion cubic metres per annum (250 billion cubic feet per annum).

Sign in to keep reading

3 more chapters are free with a Lably account.

More in Energy