Lably
Skip to content

Trans-Mongolian Railway

International railway line in Mongolia

  • 3 min read
  • 3 chapters
Trans-Mongolian Train
John Pannell · CC BY 2.0

Related on Lably

Through Soviet Union, World War II and China

History

Railway development came late to Mongolia. In 1937, a line was built from Ulan-Ude in the Soviet Union to Naushki on the border with Mongolia. In 1939, a paved road was extended to Ulaanbaatar, the country's capital. Construction of a rail line from Naushki to Ulaanbaatar was delayed by World War II, and completed in November 1949. The Soviet Union, Mongolia, and the People's Republic of China agreed to extend the line from Ulaanbaatar to the Chinese border. In Mongolia, the railway was built by the Soviet 505th Penal Unit, made up of soldiers mainly imprisoned for surrendering during the war. The railway was opened by Inner Mongolian leader Ulanhu on 1 January 1956.

In 1958, the railway switched to diesel engines and automated switching. Branches were built to the coal mines at Sharyngol in 1963 (63 km (39 mi)) and at Baganuur in 1982 (85 km (53 mi)), the copper mine at Erdenet in 1975 (164 km (102 mi)), the fluorspar mine at Bor-Öndör in 1987 (60 km (37 mi)), and the oil refinery at Züünbayan (63 km (39 mi)). Modernization in the 1990s replaced some old Soviet-made locomotives with more powerful American models, and installed fiber-optic trackside cables for communications and signaling. In 2022, lines opened linking the branch at Züünbayan with Khangi on the Chinese border, and the coal mines at Tavan Tolgoi with Gashuun Sukhait on the border. A new line linking Züünbayan with Tavan Tolgoi is under construction.

Sign in to keep reading

2 more chapters are free with a Lably account.

More in Transportation