The Tren Urbano complements other forms of public transportation services in the San Juan metropolitan area such as the Metropolitan Bus Authority, the Cataño Ferry, taxis, and shuttles. The entire mass transportation system is operated by the Integrated Transit Authority (ATI), The Tren Urbano system is operated by Alternate Concepts, Inc. (ACI). Tren Urbano is also the Caribbean's first rapid transit system.

History

In the late 19th century, while the island was under Spanish rule, regional rail systems were begun in Puerto Rico. The railroad continued to be in use under American rule for most of the first half of the 20th century and played a key role in the transportation of people and goods throughout the island. The railroad systems of the period also played a vital role in the sugarcane industry.

From 1901 to 1946 San Juan had a street tramway network, known as the "Trolley" de San Juan, and was operated by the Porto Rico Railway, Light and Power Company with more than 20 miles (32 km) of tracks and ran between San Juan and Santurce. During its heyday, it was the most modern electric streetcar system in Puerto Rico, rivaled New York and Toronto, and transported nearly 10 million passengers a year.

During the 1950s, an industrial boom, partly from development programs such as Operation Bootstrap, led to the downfall of agriculture as the principal industry on the island. Automobiles became more widely available, and more efficient roads and highways and the closure of sugarcane mills displaced the need for rail transportation. Soon, it was realized that an alternative means of mass transportation was needed to complement the public bus system to alleviate the severe traffic situation that was being created, especially in the San Juan metropolitan area.

Return of rail transit

Proposals

In 1967, proposals were made for the construction of a rapid rail transit system to serve San Juan. In 1971, the major T.U.S.C.A. study, funded jointly by the Puerto Rico Planning Board and the US federal government, recommended an islandwide elevated transit system and new community development program. That proposal would have served the San Juan metropolitan area and connected it with the rest of the island without the necessity of highway construction. However, it was not until 1989 that the Puerto Rico Department of Transportation and Public Works (Departamento de Transportación y Obras Públicas, or DTOP in Spanish) officially adopted a proposal to begin design and construction of a rail system for the San Juan metropolitan area. By 1992, various alignments of the proposed system were considered, but the final design chosen served only certain parts of the metro area and did not include Old San Juan. The name "Tren Urbano" (Urban Train) was chosen for the system. In 1993, the Federal Transit Administration (FTA) selected it as a Turnkey Demonstration Project under the Intermodal Surface Transportation Efficiency Act of 1991. In 1996 and 1997, seven design-build contracts were awarded for different segments of the Tren Urbano Phase 1 system.

A number of companies shared the tasks for building the Tren Urbano including Siemens, which was granted a concession to design and build the line and its rolling stock and to operate it for the first five years. The company won a contract in July 1996, the first of its kind in North America.

Construction

The construction project was plagued by delays, contractual disputes between the government and companies involved in the undertaking, and investigations into possible mismanagement of funds. The project cost was US$2.28 billion.

Free service

The rail system was officially inaugurated on December 19, 2004. Free service was then offered on weekends until April 2005, when weekdays were added to the free service. Popularity grew quickly, and by the end of the free period, 40,000 people were using the train on a daily basis. By late 2005, however, ridership had fallen to 24,000, well below the projection of 110,000 for 2010.

Paid fare service started on June 6, 2005. In 2006, average weekday boardings stood at 28,179 and in 2007, ridership decreased to 27,567. By the third quarter of 2008, average weekday ridership had increased to 36,500.

Issues and concerns

The Tren Urbano has no service to Old San Juan, Santurce, Luis Muñoz Marín International Airport or to many other parts of Guaynabo, Bayamón, and San Juan, and it does not serve important suburbs like Cataño, Toa Baja, Toa Alta, Carolina, Trujillo Alto, and Canóvanas, limiting ridership. Some question the viability of the system for additional reasons, such as the lack of an island-wide public-transportation system, such as the T.U.S.C.A. system proposed in 1971. The inner-city public bus transportation system, the Metropolitan Bus Authority (AMA), which operates in the Greater San Juan Metro Area, is considered unreliable by most people, and does not have a regular schedule. Integration with other transit systems, such as the AMA and the AcuaExpreso (an urban ferry), was initially poor and remains a challenge for the DTOP.

COVID-19 crisis

During the COVID-19 pandemic, services on the Tren Urbano were halted by executive order to stop the spread of the virus.