Lably
Skip to content

USS Kentucky (BB-66)

  • 9 min read
  • 4 chapters

Related on Lably

Through World War II, Shipyard and Bill (law)

As such, she was intended to be the sixth and final member of the Iowa-class constructed. At the time of her construction she was the second ship of the United States Navy to be named in honor of the U.S. state of Kentucky. Like her sister ship Illinois, laid down as one of the last pair of Iowa-class ahead of her, Kentucky was still under construction at the end of hostilities and became caught up in the post-war draw-down of the armed services. Her construction was suspended twice, during which times she served as a parts hulk. In the 1950s, several proposals were made to complete the ship as a guided missile battleship, abandoned primarily due to cost concerns and the rapid pace of evolving missile technology. Kentucky ultimately was sold for scrap in 1958.

Background

Kentucky was conceived in 1935, when the United States Navy initiated design studies for the creation of an extended South Dakota class that was not restricted by the Second London Naval Treaty. This resulted in one of the "fast battleship" designs planned in 1938 by the Preliminary Design Branch at the Bureau of Construction and Repair.

The passage of the Second Vinson Act in 1938 had cleared the way for construction of the four South Dakota-class battleships and the first two Iowa-class fast battleships (those with the hull numbers BB-61 and BB-62). The latter four battleships of the class, those designated with the hull numbers BB-63, BB-64, BB-65, and BB-66 (Missouri, Wisconsin, Illinois, and Kentucky, respectively) were not cleared for construction until 12 July 1940. While BB-63 and BB-64 were originally planned as the final ships in the Iowa-class, BB-65 and BB-66 were intended to be the first ships of the Montana class which was larger and slower while mounting twelve 16 in (406 mm) Mark 7 guns. However, the passage of an emergency war building program on 19 July 1940 resulting in Illinois and Kentucky being re-ordered as the fifth and sixth ships, respectively, of the Iowa class in order to save time on construction, so the first ship of the Montana-class would be reassigned as BB-67. The orders for BB-65 and BB-66 were placed on 9 September 1940, and the ships were laid down on 6 December 1942, and 7 March 1942, respectively.

By 1942 the United States Navy shifted its building focus from battleships to aircraft carriers after the successes of carrier combat in both the Battle of the Coral Sea, and to a greater extent, the Battle of Midway. As a result, the construction of the US fleet of Essex-class aircraft carriers had been given the highest priority for completion in the US shipyards by the US Navy. The Essex-class carriers were proving vital to the war effort by enabling the Allies to gain and maintain air supremacy in the Pacific War, and were rapidly becoming the principal striking arm of the United States Navy in the ongoing effort to defeat the Empire of Japan. Accordingly, the United States accepted shortcomings in the armor of their Iowa-class battleships in favor of additional speed, which could steam at a comparable speed with the Essex-class and provide the carriers with the maximum amount of anti-aircraft protection. As a result, construction of the Montana-class was canceled before their keels could be laid.

Sign in to keep reading

3 more chapters are free with a Lably account.

More in Weapons