Since the decommissioning of the Royal Air Force WE.177 free-fall thermonuclear weapons during March 1998, the four Vanguard submarines are the sole platforms for the United Kingdom's nuclear weapons. Each submarine is armed with up to 16 UGM-133 Trident II missiles. The class is scheduled to be replaced starting in the early 2030s with the Dreadnought-class submarine.

Development

Trident programme

Beginning in the late 1960s, the United Kingdom operated four Resolution-class submarines, each armed with sixteen US-built UGM-27 Polaris missiles. The Polaris missile was supplied to Britain following the terms of the 1963 Polaris Sales Agreement. This nuclear deterrent system was known as the UK Polaris programme. In the early 1980s the British government began studies examining options for replacing the Resolution-class submarines and their Polaris missiles, both of which would be approaching the end of their service lives within little over a decade. On 24 January 1980, the House of Commons backed government policy, by 308 votes to 52, to retain an independent nuclear deterrent. Options that were examined included:

  • A British designed and built ballistic missile; Although Britain had no capability in this field since the 1960s, it was considered "not to be impossible". However, it would be very expensive, would be full of uncertainty and would not be available within the required time period. Thus the option was considered "unattractive".
  • Retain Polaris, but fitted on a new submarine class; This option would have a cheaper "initial capital cost", but would lack in terms of required capability and reliability. Also, it was concluded that any initial capital savings would have been lost beyond the 1990s, due to the high cost of sustaining a small stockpile of bespoke missiles kept only in British service.

A European solution and the US UGM-73 Poseidon were also briefly considered, but ultimately rejected, primarily on capability, cost and uncertainty grounds. The clear favourite was the UGM-96 Trident I, which as well as being a cost-effective solution – given the US would also operate the missile in vast numbers – also delivered the overall best long-term capability insurances against Soviet advancements in ballistic missile defence. Subsequently, on 10 July 1980, the then Prime Minister Margaret Thatcher wrote to US President Jimmy Carter requesting the purchase of Trident I missiles on a similar basis as the 1963 Polaris Sales Agreement. However, following the acceleration of the US UGM-133 Trident II missiles, Thatcher wrote to US President Ronald Reagan in 1982 requesting the United Kingdom be allowed to procure the improved system instead. An agreement was made in March 1982 between the two countries, and under the agreement, Britain made a 5% research and development contribution.

Design and construction

The Vanguard class were designed in the early 1980s by the Ministry of Defence, acting in one of its last Royal Navy warship design authority roles. The naval architect and designer was [[

The guidance drawings were then supplied for detailed design development by Vickers Shipbuilding and Engineering (VSEL) based at Barrow-in-Furness, now BAE Systems Maritime – Submarines. They were designed from the outset as nuclear-powered ballistic missile submarines, able to accommodate the UGM-133 Trident II missiles. As such, the missile compartment is based on the same system used on the American Ohio class, which is also equipped with the UGM-133 Trident II. This requirement led to the Vanguard-class design being significantly larger than the previous Polaris-equipped Resolution class, and at nearly 16,000 tonnes they are the largest submarines ever built for the Royal Navy.

Due to the large size of the Vanguard-class, the Devonshire Dock Hall in Barrow-in-Furness was built between 1982 and 1986 specifically for the construction of the boats.

Beginning in 1985, both HMNB Clyde and the Royal Naval Armaments Depot Coulport at Faslane underwent extensive redevelopment in preparation for the Vanguard class submarines and Trident II missiles. Rosyth dockyard also underwent significant redevelopment. The work included enhanced "handling, storage, armament processing, berthing, docking, engineering, training and refitting facilities" at an estimates cost of £550 million.

Margaret Thatcher laid the keel of the first boat, HMS Vanguard, on 3 September 1986 at the Devonshire Dock Hall. Vanguard was launched in 1992 and commissioned in 1993. The year 1992 saw a debate over whether the fourth vessel, Vengeance, should be cancelled; however, the government ultimately ordered it in July 1992 and she was commissioned in 1999.

Replacement

The Vanguard class had an originally intended service life of 25 years. This would put the retirement dates for the class at 2018, 2020, 2021, 2024.

On 4 December 2006, then Prime Minister Tony Blair revealed plans to spend up to £20 billion on a new generation of ballistic missile submarines to replace the Vanguard class. In order to reduce costs and show Britain's commitment to the Non-Proliferation Treaty, Blair suggested that submarine numbers could be cut from four to three, while the number of nuclear warheads would be cut by 20% to 160. On 23 September 2009, then Prime Minister Gordon Brown confirmed that this reduction to three submarines was still under consideration. In February 2011, the Defence Secretary Liam Fox stated that four submarines would be needed if the UK was to retain a credible nuclear deterrent. On 18 May 2011 the British government approved the initial assessment phase for the construction of a new class of four submarines, paving the way for the ordering of the first long-lead items and preparations for the main build to begin in the future. This new class of submarine, now known as the Dreadnought class, will retain the current Trident II missiles, and will incorporate a new 'PWR3' nuclear reactor as well as technology developed for the Astute-class nuclear-powered fleet submarines of the Royal Navy.

A vote on the Trident renewal programme was held in the House of Commons on 18 July 2016, and determined that the UK should proceed with construction of the next generation of submarines. The motion passed with a significant majority of 472 MPs voting in favour and 117 against. The MoD put the cost of building, testing and commissioning the replacement vessels at £31 billion (plus a contingency fund of £10 billion) over 35 years, or about 0.2 per cent of government spending, or 6 per cent of defence spending, every year. It is expected the new fleet of submarines will come into operation starting 2028 at the earliest and certainly by the 2030s. The Dreadnought class will extend the life of the Trident programme until at least the 2060s.