Wind power in Connecticut

Electricity from wind in one U.S. state

  • 5 min read
  • 5 chapters

Related on Lably

Through Watt

Legislation

Until 2019, Connecticut was the only state in the United States to disallow the construction of utility-scale wind turbines. The state's two and a half year old ban on wind power was enacted in 2011, ostensibly to provide time for the Connecticut Siting Council to enact regulations governing the siting of wind turbines in the state. Those regulations were written in 2012 to address health and safety issues related to wind power, such as maximum noise levels and distances from neighboring properties, but the legislative committee tasked with approving state agency regulations has repeatedly refused to approve the regulations. On November 26, 2013, the Connecticut General Assembly's Regulation Review Committee, for the fourth time since 2012, blocked the Connecticut Siting Council's Regulations that would have ended the state's ban on new wind power projects. The committee, led by co-chairman State Representative Selim Noujaim, forced the Siting Council to withdraw its proposal. This ban stands in stark contrast to Connecticut’s renewable energy laws requiring utilities to purchase 27% clean electricity (23% renewable) by the year 2020.

Concerns about the development of regulations were documented at the CT Siting Council’s public forum on October 13, 2011, and its public hearing on July 24, 2012.

In its second draft of wind regulations, the CT Siting Council increased the setback distance from 1.1 times to 1.5 times the height of an industrial wind turbine from property lines. Drafts 1, 2 and 3 were each rejected without prejudice by the Regulations Review Committee. The CT Siting Council submitted the third rejected draft again, unchanged, for a vote of the Regulations Review Committee on November 26, 2013. During that meeting, the CT Siting Council decided to withdraw the previously rejected third draft instead of putting it to another vote.

The fourth draft was set for a vote at the April 22, 2014, meeting of the Regulations Review Committee. Changes in this draft include a financial assurance for decommissioning and requiring a 3/4 vote (rather than a simple majority) of the CT Siting Council for it to waive minimum setback distances and maximum shadow flicker on occupied structures. The CT Siting Council did not increase the setback distance.