Aqua Line (Mumbai Metro)

Underground Line of the Mumbai Metro

  • 31 min read
  • 9 chapters

Related on Lably

Through India, Supreme Court of India and Government of India

The project was implemented is operated by the Mumbai Metro Rail Corporation Limited (MMRCL). The total cost of this line is estimated at ₹30,000 crore (US$3.1 billion). The project was funded by five major groups: MMRCL, Padeco, MMRDA, and JICA; the last of which provided a soft loan of ₹13,235 crore (US$1.4 billion).

The section of the line between Bandra Kurla Complex and Dharavi stations includes a 170-metre (560 ft) long twin-tunnel passing under the Mithi River. This is the second under-river metro rail tunnel in India after the first tunnel underneath the Hooghly River on Kolkata Metro Green Line. The first phase of the project was inaugurated on 5 October 2024 by Prime Minister Narendra Modi. The ₹14,120 crore BKC to Aarey Jogeshwari-Vikhroli Link Road section of the line, which consists of 10 stations. Phase 2A of the line stretching from BKC to Acharya Atre Chowk, covering an additional five stations, was inaugurated on 9 May 2025, under the hands of CM Devendra Fadnavis and other officials present. The final 10.99 km stretch of the line from Acharya Atre Chowk to Cuffe Parade was inaugurated by Modi, along with the Navi Mumbai International Airport on 8 October 2025.

The construction of this metro route faced hurdles from environmentalists and activists lodging numerous PILs over cutting of trees in various regions accompanied with a larger protest in Aarey over the carshed construction. PILs were either dismissed or did not succeed, as both the Supreme Court and the Bombay High Court cited the importance of the metro project. Initial projections for the Aqua Line anticipated daily ridership of nearly 1.5 million passengers; however, subsequent estimates indicate that actual usage has reached only about 150,000 passengers per day.

Background

A 20 km (12.4 mi) metro line from Colaba to Bandra was announced in January 2004, as part of a master plan unveiled by the Mumbai Metropolitan Region Development Authority (MMRDA). The plan encompassed a total of 146 kilometres (90.7 mi) of track, of which 32 kilometres (19.9 mi) was proposed to be underground. The MMRDA unveiled plans for an extended Colaba-Bandra-SEEPZ metro line in 2011. According to its earlier plans, a 20 km (12.4 mi) metro line from Colaba to Bandra was to be constructed, running underground for 10 kilometres (6.2 mi) from Colaba to Mahalaxmi, and then on an elevated track from Mahalaxmi to Bandra. The MMRDA decided to extend the line to the Chhatrapati Shivaji Maharaj International Airport to increase ridership. The 33.5-kilometre (20.8 mi) Colaba-Bandra-SEEPZ line was estimated to cost ₹21,000 crore (US$2.2 billion), have 27 stations, and would be the city's first fully underground metro line. at Nariman Point, BKC, MIDC, SEEPZ, and elsewhere. According to the MMRDA, an underground metro will minimise land acquisition and disturbance to traffic during construction compared to an elevated metro.

The Mumbai Metro Rail Corporation Ltd (MMRC), registered under provisions of Company Act, 1956, was constituted as a fully owned company of the MMRDA on 30 April 2008, as per state government directives. On 27 February 2012, the Central Government gave in-principle approval to the plan for the Aqua Line. In April 2012, the MMRDA announced plans to grant the MMRC increased management autonomy, in an effort to enhance the project's operational efficiency.