Description

Arctic LNG 2 is Novatek's second large scale LNG project after Yamal LNG. Its three trains, each with a planned capacity of 6 million tonnes per year, are expected to have a combined capacity of 19.8 million tonnes, or more than 27 billion cubic metres. The facility was planned to be commissioned in stages from 2023, with the first train scheduled for 2023, the second for 2024, and the third for 2026.

The project is expected to produce 19.8 million tonnes of LNG annually, compared with 16.5 million tonnes at Yamal LNG, as well as 1.6 million tonnes of stable gas condensate.

The project obtained licences for the Salmanovskoye field and the Shtormovoye field, and secured the right to export liquefied natural gas alongside Novatek's other projects: Yamal LNG, Arctic LNG 1, a planned project on the Gydan Peninsula, and Arctic LNG 3, based on the North Ob federal licence block in the waters of the Ob Bay.

The project is being developed using gravity-based structures. By shifting major construction work away from the field site itself, the developers said they would reduce the project's environmental impact.

In 2021, Utrenniy Airport was built to provide year-round transport for rotational personnel travelling to the Utrenneye field.