Belleville Nuclear Power Plant

  • 2 min read
  • 2 chapters

Related on Lably

Through Hectare and International Atomic Energy Agency

Key information

The site spans 170 hectares and is located on a flood-safe, 4.6-meter-high platform. Each year it produces an average of 19 billion kilowatt hours fed to the electricity grid, and thus covers about four percent of French electricity production.

With the construction of the first reactor was started on 1 May 1980, and it began operation 14 October 1987. The second unit started construction 1 August 1980 and began operation 6 July 1988. The shutdown of the reactors is planned for the years 2028 and 2029 for unit 1 and 2 respectively.