Lably
Skip to content

Buffalo Creek flood

1972 dam failure in West Virginia, United States

  • 4 min read
  • 4 chapters

Related on Lably

Through Sociology

The impoundment dam, managed by Pittston Coal Company, had been declared "satisfactory" by a federal mine inspector four days earlier. In its legal filings, Pittston referred to the accident as "an Act of God."

Terrain and sequence of events

There were three dams on the site. Dam #3 failed first. Located about 260 feet (79 m) above the town of Saunders, it was built on top of coal slurry sediment that had collected behind dams #1 and #2, instead of on solid bedrock. It was constructed of coarse mining refuse dumped into the Middle Fork of Buffalo Creek.

Dam #3's failure was followed by heavy rains. The water from dam #3 then overwhelmed dams #2 and #1. The resulting flood unleashed approximately 132 million US gallons (500,000 cubic metres; 500 million litres) of black waste water, cresting over 30 feet (9.1 m) high, upon the residents of 16 coal towns along Buffalo Creek Hollow. Out of a population of 5,000 people, 125 were killed, 1,121 were injured, and over 4,000 were left homeless. 507 houses were destroyed, in addition to 44 mobile homes and 30 businesses. The disaster destroyed or damaged homes in Saunders, Pardee, Lorado, Craneco, Lundale, Stowe, Crites, Latrobe, Robinette, Amherstdale, Becco, Fanco, Braeholm, Accoville, Crown and Kistler.

Sign in to keep reading

3 more chapters are free with a Lably account.

More in Environment