Lably
Skip to content

Bujagali Hydroelectric Power Station

  • 4 min read
  • 6 chapters

Related on Lably

Through World Bank Group and Kenya

The 250-megawatt power station was the largest hydroelectric energy source in Uganda when it was commissioned. However, the planned Karuma and Ayago power stations would be larger. The funding for the station was a source of some concern, as investors joined and departed from the project. As of July 2014, the plant was managed by Bujagali Energy Limited, which selected Italian contractor Salini Impregilo to develop the project.

Location

The power station lies across the Victoria Nile, about 15.5 kilometres (10 mi) north-west of the central business district of the city of Jinja and immediately north of the former location of the Bujagali Falls. It is at the border between Buikwe District to the west and Jinja District to the east. The coordinates of Bujagali Power Station are 0° 29'54.00"N, 33° 08' 15.00"E (latitude:0.498325; longitude:33.137500).

Sign in to keep reading

5 more chapters are free with a Lably account.

More in Energy