Lably
Skip to content

Bujagali–Tororo–Lessos High Voltage Power Line

High voltage electricity power line in Uganda and Kenya

  • 1 min read
  • 4 chapters

Related on Lably

Through Kenya

Location

The power line starts at Bujagali Hydroelectric Power Station, in Jinja District, as a 220kV high voltage power line. From here, the line travels to the eastern Ugandan town of Tororo, a distance of about 127 kilometres (79 mi). At Tororo, the voltage is stepped up to 400kV, and the line travels in that state, through the town of Eldoret, to Lessos, in Nandi County, a total distance of approximately 133 kilometres (83 mi).

Sign in to keep reading

3 more chapters are free with a Lably account.

More in Energy