The Cahora Bassa Dam is one of two major dams on the Zambezi, the other being the Kariba Dam. The project commenced in 1969 and, after much political debate, began to come online in 1979. Jointly owned by the governments of Mozambique and Portugal, from independence until 2007, eighteen percent share of the dam and its reservoir was owned by Mozambique and eighty-two percent by Portugal. In 2007, Portugal sold down its share to 15 percent. The Cahora Bassa Dam is the largest hydroelectric power plant in southern Africa and the most efficient power-generating station in Mozambique.

History

Before construction began, native peasants protested against the dam in a bid to retain ownership and/or use of their farm land. When given the order to begin construction in 1969, the Portuguese colonial government of Mozambique forced the native peasants out of their homes and villages in order for the Portuguese and European workers to have a place to live during construction. The Portuguese government built a small town for all the contractors, electricians, and engineers on top of the native Mozambique homes. The evicted native peasants were not given compensation for their loss of property. In 2021, it was claimed that over one million peasants living downriver were adversely impacted by the dam; and that more than 42,000 people were displaced.

In addition to power generation, it was expected that the naming of the Zambezi would result in more irrigated farming, increased European settlement and mineral output, improved communication and transport throughout the valley, and reduced flooding events as a result of unpredictable and sometimes excess rainfall.

Construction begun in 1969, authorised by the colonial government, and the dam commenced filling in December 1974 and was just 12 metres (39 ft) below full supply level within six months. During the construction phase, long stretches of the power transmission lines were sabotaged during 16 years of Mozambican Civil War which ended in 1992. It was claimed that the South Africa apartheid government supported development of the dam in order to quell anti-colonial guerrilla forces such as the FRELIMO and its ally, the African National Congress (ANC). The dam was built to produce electricity for South African farms, mines, and cities. Since the dam transfers the electricity that it creates to South Africa, it takes electricity away from the natives who kept some of their land. In 2009, it was reported that the natives struggle to access electricity and a regular supply of clean drinking water.