Lably
Skip to content

Kariba Dam

Dam in Zambia and Zimbabwe

  • 8 min read
  • 5 chapters
Kariba Dam of the Zambezi (Zambia/Zimbabwe)
Benbbb (Ben Bird) · Public domain

Related on Lably

Through Italy, Hydropower and Anthropology

Construction

The dam was constructed on the orders of the Government of the Federation of Rhodesia and Nyasaland, a 'federal colony' within the British Empire. The consulting engineers, were Gibb, Coyne, Sogei (Kariba) (PVT.) Limited, a joint venture of consulting engineers, which included Sir Alexander Gibb & Partners (the team was led by Sir Angus Paton), and Coyne et Bellier (the team was led by André Coyne). The double curvature concrete arch dam was constructed between 1955 and 1959 by Cogefar-Impresit of Italy at a cost of $135,000,000 for the first stage with only the Kariba South power cavern. Final construction and the addition of the Kariba North Power cavern by Mitchell Construction was not completed until 1977, due to largely political problems, for a total cost of $480,000,000. During construction, 86 construction workers lost their lives.

The dam was officially opened by Queen Elizabeth the Queen Mother on 17 May 1960.

Sign in to keep reading

4 more chapters are free with a Lably account.

More in Infrastructure