China Jinping Underground Laboratory

Underground research facility in China

  • 5 min read
  • 3 chapters

Related on Lably

Through Marble, Igneous rock and Canada

Although the marble through which the tunnels are dug is considered "hard rock", at the great depth it presents greater geotechnical engineering challenges than the even harder igneous rocks in which other deep laboratories are constructed. The 10 MPa (1500 psi; 99 atm) water pressure in the rock is also inconvenient. But marble has the advantage for radiation shielding of being low in radionuclides, such as 40K, 226Ra, 232Th, and 238U. This in turn leads to low levels of radon (222Rn) in the atmosphere.

The laboratory is in Liangshan in southern Sichuan, about 500 km (310 mi) southwest of Chengdu. The closest major airport is Xichang Qingshan Airport, 120 km (75 mi) away by road.

History

The Jinping-II Dam hydroelectric power project involved excavating a number of large tunnels under the Jinping Mountains: four large 16.7 km (10.4 mi) headrace tunnels carrying water east, two 17.5 km (10.9 mi) vehicular access tunnels, and one water drainage tunnel. Hearing of the excavation in August 2008, physicists at Tsinghua University determined that it would be an excellent location for a deep underground laboratory, and negotiated with the hydropower company to excavate laboratory space in the middle of the tunnels.

A formal agreement was signed on 8 May 2009, and excavation was promptly started. The first phase CJPL-I, consisting of a 6.5 × 6.5 × 42 m (21 × 21 × 138 ft) main hall, plus 55 m (180 ft) of access tunnel (4,000 m3 total excavation) was excavated by May 2010, and construction completed 12 June 2010. A formal laboratory inauguration was held 12 December 2010.

The laboratory is to the south of the southernmost of the seven parallel tunnels, traffic tunnel A.

The air ventilation in CJPL-I was initially inadequate, resulting in the accumulation of dust on the equipment and radon gas in the air until additional ventilation was installed.

A more difficult problem is that the walls of CJPL-I were lined with ordinary concrete taken from the hydroelectric project's supply. This has a natural radioactivity higher than desirable for a low-background laboratory. The second phase of construction uses materials selected for low radioactivity.