Cometa (HVDC)

Undersea electric power transmission system

  • 2 min read
  • 2 chapters

Related on Lably

Through Alternating current

History

On 26 September 2007, contracts between Red Electrica de España and the cable manufacturers Nexans and Prysmian were signed. On 9 October 2007, a contract with Siemens was signed for supplying two converter stations.

The laying of the first cable started on 13 January 2011 and the laying of the second cable started on 27 January 2011. The first cable was laid by the cable ship Giulio Verne and the second cable was laid by the cable ship Nexans Skagerrak. Trenching was done by waterjet from the Multipurpose Supply Vessel (MPSV) Edda Fjord and dredger Argo I.

COMETA became operational in early 2012, initially at reduced capacity then in full capacity from August 2012. The total cost of the project was €375 million. During the first operational quarter, the Spanish grid operator estimated that the connection would mean 25 million €/year in savings, due to more efficient supply to the islands and less carbon rights.

An extension of the connection to Ibiza and Formentera was planned with a second underwater cable, (115 km) long and 800 m deep, operating at 132 kV AC.

Sign in to keep reading

One more chapter is free with a Lably account.

More in Energy