DIRECT & Jupiter Rocket Family

Proposed family of US super heavy-lift launch vehicles

  • 23 min read
  • 6 chapters
  • 6 labs on Lably

Learn it on Lably

Major benefits were projected from re-using as much hardware and facilities from the Space Shuttle program as possible, including cost savings, experience with existing hardware, and preserving the workforce.

DIRECT proposal

DIRECT was a late-2000s proposed alternative super heavy lift launch vehicle architecture supporting NASA's Vision for Space Exploration that would replace the space agency's planned Ares I and Ares V rockets with a family of Shuttle-Derived Launch Vehicles named "Jupiter".

DIRECT was advocated by a group of space enthusiasts who asserted that they represented a broader team of dozens of NASA and space industry engineers who actively worked on the proposal on an anonymous, voluntary basis in their spare time. In September 2008, the DIRECT Team was said to consist of 69 members, 62 of whom were NASA engineers, NASA-contractor engineers, and managers from the Constellation Program. The small number of non-NASA members of the team publicly represented the group.

The project name "DIRECT" referred to a philosophy of maximizing the re-use of hardware and facilities already in place for the Space Shuttle program (STS), hence a "direct" transition. The DIRECT Team asserted that using this approach to develop and operate a family of high-commonality rockets would reduce costs and the gap between retirement of the Space Shuttle and the first launch of Orion, shorten schedules, and simplify technical requirements for future US human space efforts.

Three major versions of the DIRECT proposal were released with the last, Version 3.0, unveiled in May 2009. On 17 June 2009, the group presented its proposal at a public hearing of the Review of U.S. Human Space Flight Plans Committee, a panel reviewing US space efforts, in Washington D.C.

With the October 11th signing of the NASA Authorization Act of 2010 (S. 3729) by President Obama mandating work on the Space Launch System Heavy Lift Launch Vehicle, the DIRECT Team declared their effort a success and disbanded.

Jupiter launch vehicle family

DIRECT advocated developing a single, high-commonality family of rockets named Jupiter, adapted closely from existing Space Shuttle systems. Each Jupiter launch vehicle would use a "common core stage" consisting of a tank structure based closely on the existing Space Shuttle External Tank with a pair of standard four-segment Solid Rocket Boosters (SRBs) mounted at the sides as on the Space Shuttle. Up to four Space Shuttle Main Engines (SSMEs) from the Space Shuttle Orbiter would be attached to the bottom of the External Tank. The engines would be deorbited along with the expended tank to burn up in the Earth's atmosphere.

Crews would be carried atop the launch vehicle in NASA's planned Orion Crew Exploration Vehicle, itself topped by the planned Launch Abort System. Cargo, whether carried behind the Orion spacecraft or alone on a cargo-only launch would be enclosed by a payload fairing.

Many configurations of Jupiter were seen as possible, but the DIRECT version 3.0 proposal, released in May 2009, recommended two: the Jupiter-130 and Jupiter-246, with claimed lift capacities exceeding 70 and 110 tonnes, respectively, to low Earth orbit.

Proposed and Possible Missions

Low Earth Orbit and Uncrewed Scientific Missions

DIRECT asserted that the extra payload capability of the Jupiter-130 would allow for a range of additional cargo payloads to be flown with each Orion crew, a capability which is not possible with the Ares I. The team suggested a number of extra missions which would be enabled by Jupiter in their proposal, including:

  • New ISS resupply missions with the three ESA/ASI-built Multi-Purpose Logistics Modules
  • Performing more Hubble Space Telescope Servicing Missions with Orion crews
  • Launching massive new space telescopes over 8 meters in diameter (more than 3 times the diameter of Hubble)
  • Perform a Mars Sample Return mission on a single Jupiter launcher, to land on Mars and return a sample of its soil back to Earth for study as early as 2013
  • Launching a human crew to fly around the moon as early as 2013

The DIRECT team asserted that these additional new missions could have been planned and funded due to development cost savings with the Jupiter rocket family compared to the current NASA baseline. They suggested that the proposed new missions and payloads could provide useful employment for many people who were working in the Space Shuttle program.

Lunar Mission Architecture

As with NASA's Constellation Program baseline, two launches would be performed for a DIRECT lunar mission. One Jupiter-246 rocket would carry the crew in NASA's planned Orion Crew Exploration Vehicle along with NASA's planned Lunar Surface Access Module lunar lander. Another Jupiter-246 would be launched, its Jupiter Upper Stage (JUS) fully fueled with no payload. This particular JUS would serve as the Earth Departure Stage. The two upper stages would meet in low Earth orbit and the lunar spacecraft would transfer from the spent JUS to the fresh JUS. The assembled Orion/Altair/JUS would leave Earth orbit for the Moon. The spacecraft would enter lunar orbit, and the entire crew would descend to the Moon in the Altair while the Orion remained in lunar orbit.

DIRECT calculated that the two Jupiter-246s will be able to send 80.7 t of mass through trans-lunar injection. This compared favorably with an Ares I / Ares V dual launch, as of September 2008, projected to be capable of 71.1 t.