Lably
Skip to content

Saturn V

American super heavy-lift expendable rocket

  • 37 min read
  • 8 chapters
The Apollo 11 Saturn V rocket launch vehicle lifts-off with astronauts Neil A. Armstrong, Michael Collins and Edwin E. Aldrin, Jr., at 9:32 a.m. EDT July 16, 1969, from Kennedy Space Center's Launch C
NASA · Public domain

Related on Lably

Through Multistage rocket, Space station and Newton (unit)

The Saturn V was the first launch vehicle to carry humans beyond low Earth orbit (LEO), with the only other to do so being the Space Launch System (SLS) for the Artemis II lunar flyby in 2026. The Saturn V holds the record for the largest payload capacity to low Earth orbit, 140,000 kg (310,000 lb), which included the S-IVB third stage with remaining propellant to send the Apollo command and service module and Lunar Module to the Moon. At 34.5 meganewtons, it is the fourth most powerful rocket by thrust at launch and the second most powerful to carry humans, after SLS at 39 meganewtons.

The largest production model of the Saturn family of rockets, the Saturn V was designed at the Marshall Space Flight Center (MSFC) in Huntsville, Alabama. The program was managed by American George Mueller; technical design was led by scientists relocated from Nazi Germany, most notably Wernher von Braun, as well as Kurt Debus and Arthur Rudolph. This group had developed the first US launch vehicles, the Redstone rocket family, under the Army Ballistic Missile Agency. All engines were built by Rocketdyne. Boeing built the kerolox S-IC first stage powered by five F-1 engines; these remain the most powerful single chamber liquid-fuelled engines ever built. North American Aviation the hydrolox S-II second stage, and Douglas Aircraft Company the hydrolox S-IVB third stage, powered by five and one J-2 engines respectively. IBM and MSFC designed the rocket's instrument unit.

The rocket first launched in the November 1967 Apollo 4 test flight. Two unused Saturn Vs were built, originally designated for Apollo 19 and 20; three ground test articles were also built. Unrealized follow-on concepts included the Saturn II, Saturn MLV, and Saturn V ELV vehicles, which could include UA120 solid rocket boosters, the Saturn C-5N using a NERVA nuclear thermal rocket third stage, and the Saturn-Shuttle. Further flights were proposed for the Skylab B space station, Voyager Mars orbiters and landers, Prospector lunar rover, and a manned Venus flyby.

History

Background

In September 1945 German rocket technologist Wernher von Braun was brought, under contract, to the United States during Operation Paperclip. Operation Paperclip, authorized by President Truman, brought in over 1,600 German rocket engineers and technicians from former Nazi Germany after World War II to the United States for government employment. Von Braun, who had helped create the German V-2 rocket, was assigned to the United States Army Ordnance Corps at Fort Strong, Massachusetts, then at Fort Bliss, Texas. During his time at Fort Bliss, von Braun and his team were not given much to work with. In the first couple of months, the Germans were only given "primitive or aged" wooden workshops and were not allowed to leave Fort Bliss without a military escort. In 1950, von Braun remarked to Daniel Lang, a reporter at The New Yorker, "At Peenemünde we had been coddled, here you were counting pennies." However, he wrote books and articles in popular magazines, such as Collier's.

This approach changed in 1957, when the Soviets launched Sputnik 1 atop an R-7 ICBM, which could carry a thermonuclear warhead to the U.S. The American Army and government began putting more effort towards sending Americans into space before the Soviets. The Army turned to von Braun's team, who had created the Jupiter series of rockets. The Juno I rocket launched the first American satellite in January 1958. Von Braun considered the Jupiter series of rockets to be a prototype of the upcoming Saturn series of rockets, and referred to it as "an infant Saturn".

Design process

The Saturn rocket family was named after the planet Saturn because the design of the various Saturn rockets evolved from the earlier Jupiter vehicles, which were named after the planet Jupiter. Between 1960 and 1962, the Marshall Space Flight Center (MSFC) designed a series of Saturn rockets that could be deployed for Earth orbit and lunar missions. NASA planned to use a Saturn vehicle as part of the Earth orbit rendezvous (EOR) method for a lunar mission. Development on the Saturn C-3 rocket was just beginning when the MSFC planned an even bigger rocket, the Saturn C-4, which would use four F-1 engines in its first stage and five J-2 engines in its second stage.

On January 25, 1962, NASA gave its approval to build the C-5. The three-stage rocket would consist of the S-IC first stage, with five F-1 engines; the S-II second stage with five J-2 engines; and the S-IVB third stage, with a single J-2 engine. The C-5 would undergo component testing even before the first model was constructed. The S-IVB third stage would be used as the second stage for the C-1B, which would serve both to demonstrate proof of concept and feasibility for the C-5 and to provide flight data critical to the development of the C-5. Rather than undergoing testing for each major component, the C-5 would be tested in an "all-up" fashion, meaning that the first test flight of the rocket would include complete versions of all three stages. By testing all components at once, far fewer test flights would be required before a crewed launch. The C-5 was confirmed as NASA's choice for the Apollo program in mid-1962, and was named the Saturn V in February 1963. In the same month, the C designations were dropped; the C-1 became the Saturn I and C-1B became Saturn IB. By November 1962, NASA had switched to and confirmed a lunar orbit rendezvous (LOR) method for a lunar mission. The outside contractors that were chosen for the construction were: Boeing (S-IC), North American Aviation (S-II), Douglas Aircraft (S-IVB), and IBM (S-IU).

Selection for Apollo lunar landing

Early in the planning process, NASA considered three methods for the Moon mission: Earth orbit rendezvous (EOR), direct ascent, and lunar orbit rendezvous (LOR). A direct ascent configuration would require an extremely large rocket to send a three-man spacecraft to land directly on the lunar surface with enough fuel to fly back to Earth. NASA proposed the Nova for this method. An EOR would launch the direct-landing spacecraft in two smaller parts which would combine in Earth orbit. A LOR mission would involve a single rocket launching two spacecraft: a mother ship, and a smaller, two-man landing module which would rendezvous back with the main spacecraft in lunar orbit. The lander would be discarded and the mother ship would return home.

Originally, in the early 1960s, when the Saturn project was transferred to NASA from the U.S Army, direct ascent was the preferred method. At the same time, the Air Force had been developing of a lunar mission named Lunex, which would use the direct ascent method. The Space Systems Division estimated that a mission to the Moon using direct ascent could be done by 1967 at an estimated cost of $7.5 billion (equivalent to $60.1 billion in 2024). NASA dismissed both of the rendezvous methods as "dangerous and impractical." Von Braun's team had shown an interest in using the EOR method as early as 1958, arguing that smaller vehicles could be used. Around the same time, Thomas Dolan and his team from the Vought Astronautics Division became the first to study the LOR method. Although his team presented their ideas to NASA, nothing came from his proposal.

In 1960, several NASA officials, including Langley Research Center engineer John Houbolt, argued that a lunar orbit rendezvous provided the simplest landing on the Moon with the most cost–efficient launch vehicle, and the best chance to accomplish the lunar landing within the decade. Throughout 1961, Houbolt and his team went around convincing other research teams to pursue LOR, catching the attention of the chief of the Engineering Division, James Chamberlin. Although in charge of what would later become Project Gemini, he proposed using a two-man spacecraft using LOR to send a one-man lunar lander to the surface of the Moon. Although Chamberlin's plan stalled, it did mark a shift towards LOR. Houbolt also managed to convince NASA official George Low. In June 1962, von Braun announced LOR would be MSFC's choice. As more NASA officials became convinced, LOR was officially selected and announced as the mission configuration for the Apollo program on November 7, 1962 by NASA administrator James E. Webb.

Development

A boilerplate Apollo spacecraft, BP-027 was used for all configurations of dynamic testing. The boilerplate took the place of actual flight hardware. Boilerplate size, shape, mass, and center of gravity were the same, but it was not necessary for the entire Apollo spacecraft to be completed to commence dynamic testing. The boilerplate was outfitted with instrumentation to record data for engineering study and evaluation. BP-27 was accepted at the Marshall Space Flight Center in late September 1964.

The third stage, the S-IVB-D arrived at MSFC before any other Saturn V stage because it was first needed for dynamic testing of the Saturn IB rocket. The third stage arrived on January 4, 1965. Next, the instrument unit, S-IU-200D/500D, was built. Unlike the other major components of the rocket, the instrument unit was built in Huntsville, Alabama, where the MSFC is located. The ring was completed in January 1965 and electronic components from IBM installed by February 1. Like the third stage, it arrived before the other stages because it was needed for dynamic testing in the Saturn IB first.

The first stage of the Saturn V rocket, S-IC-D, set out on the maiden voyage of NASA barge Poseidon to Marshall Space Flight Center on October 6, 1965, and arrived on October 13. While the first stage was on its way, dynamic testing for the Saturn V program using the test rocket SA-500D began on October 8. The first stage was lifted into place in the dynamic test stand January 13, 1966.

The second stage of the SA-500D had a complex history. Originally, NASA wanted to use the S-II-D stage for its dynamic testing. However, in the spring of 1965, NASA canceled the production of the S-II-D stage and instead opted to use the S-II-S stage for its dynamic tests. The S-II-S stage, which North American Aviation's Space and Information Systems Division (S&ID) at Seal Beach had completed by January 31, 1965, was re-designated as S-II-S/D to be used for dynamic testing. The S-II-S/D would rupture and be destroyed during a test on September 29, 1965 at Seal Beach. It was discovered that the test was exercising a considerable margin above the structural limits required for flight, approximately 144 percent of its designed load limit. Because of this, NASA was forced to substitute the S-II-T stage for testing. In early 1966, the S-II-T was re-designated S-II-T/D, so it could be used for dynamic testing as well as engine firing. On May 28, 1966, S-II-T/D was undergoing a pressure test to find a hydrogen leak, but the hydrogen pressure sensors and switches had been disconnected unbeknownst to the second-shift crew. As a result, the crew, believing that a valve was leaking liquid hydrogen, began closing valves. This caused the liquid hydrogen tank to over pressurize and explode, injuring five men and hospitalizing two others.

After the S-II-T/D was destroyed, the S-II-F stage was assigned to dynamic test duties. The S-II-F stage was at the Kennedy Space Center being used as a non-flight version of the stage. Being shipped from Seal Beach, California, to Kennedy Space Center where it arrived March 4. The S-II-F, now designated S-II-F/D, arrived at the MSFC on November 10, 1966.

Testing

Dynamic testing examined "the vehicle's response to lateral, longitudinal, and torsional excitation, simulating those that would be experienced in flight. The vehicle was "mounted on a hydrodynamic support system made up of four hydraulic/pneumatic pedestals to permit a simulated unrestrained reaction." Engineers tested vibrations in one plane at a time with different amounts of ballast simulating "fuel load at critical time points in the flight trajectory."

Dynamic tests were conducted in three configurations, one for each phase of Saturn V-powered flight. Configuration I tested the entire stack for its bending and vibration characteristics, as if the vehicle had just been launched. Configuration II tested the stack as if the first stage had jettisoned and the second stage were firing, and configuration III tested only the third stage and Apollo spacecraft. Tests began with Configuration III in the Saturn IB dynamic test facility. Configuration III testing took place in late 1965. Configuration I testing followed in the Saturn V dynamic test stand, then Configuration II in the same place. With all the components at MSFC as of November 10, 1966, the second stage was stacked atop the first inside the dynamic test stand on November 23. The third stage was added to the stack November 30, and the Instrument Unit and boilerplate Apollo were installed in December. The rocket was stacked and ready for "Configuration One" testing.

Configuration One Testing finished on March 11. Testing produced "several minor irregularities indicating the need for possible engineering changes" Configuration Two testing followed; in which the first stage was removed from the stack to simulate conditions after the first stage had jettisoned. On August 3, 1967, MSFC announced the successful completion of the dynamic test program, thereby declaring the dynamics and structures of the Saturn V ready for its first launch later in the year. The dynamic testing resulted in "several slight modifications" to the final flight vehicle.

Launch history

Sign in to keep reading

7 more chapters are free with a Lably account.

More in Space