Lably
Skip to content

Enbridge Pipeline System

Canada–US oil pipeline

  • 6 min read
  • 4 chapters

Related on Lably

Through Petroleum, Pipeline and Canada

Background

The first portion of the pipeline was built over the course of 150 days in 1950 by a 1,500-man labour force. It crossed approximately 1,600 kilometres (990 mi) from Redwater, Alberta, through Saskatchewan, Manitoba, North Dakota, and Minnesota, to the Great Lakes seaport of Superior, Wisconsin. At the same time, four oil tankers were constructed to carry the crude from Superior to oil refineries in Sarnia, Ontario. Oil first entered the pipe on August 25, 1950, and the first tanker, Imperial Leduc, was launched on November 4. Other tankers that followed were, Imperial Redwater, Imperial Woodbend, and B.A. Peerless.

Because the lakes froze in the winter, preventing tanker traffic, the decision was soon made to expand the pipeline all the way to Sarnia. In May 1953, contracts were awarded and construction began. At 2,840 kilometres (1,760 mi), it became the world's longest pipeline. A major upgrade was undertaken in the 1990s to replace old pipe and expand the system.

Sign in to keep reading

3 more chapters are free with a Lably account.

More in Energy