Flamanville Nuclear Power Plant

Nuclear power plant in Manche, France

  • 7 min read
  • 3 chapters

Related on Lably

Through Power station and Watt

Construction of unit 3 began in 2007 with its commercial introduction scheduled for 2012. Areva, the company in charge of the project, proved unable to manage it (just like Olkiluoto 3), leading to the ultimate demise of the company. Various safety problems have been raised, including weakness in the steel used in the reactor. In July 2019, further delays were announced, pushing back the commercial introduction date to the end of 2022. As of 2020 the project was more than five times over budget. In January 2022, more delays were announced, with fuel loading continuing until mid-2023, and again in December 2022, delaying fuel loading to early 2024. Fuel loading was completed in May 2024. The reactor eventually started up in early September 2024 and was connected to the grid at 11:48 AM on 21 December 2024.

Unit 1 & 2

History

During the 1970s, Flamanville was one of the proposed construction sites for the French civil nuclear program. A 1975 poll of local inhabitants showed 63.7% in favor of the project.

Following a public inquiry, the formal declaration of public utility was published in 1977, in time for a January 1978 groundbreaking. The official start of construction was recorded as December 1979 for Unit 1 and May 1980 for Unit 2. First criticality was achieved in September 1985 and June 1986, with connections to the grid in December 1985 and July 1986 and full commercial operation in December 1986 and March 1987.

Characteristics

Units 1 and 2 are Generation II pressurized water reactors of hybrid design, with a nuclear island of type P4 and the conventional / turbine island of type P'4.

The reactor coolant systems (reactor vessel, steam generators, reactor coolant pumps) were furnished by Framatome. The two turbine islands (steam turbines, turbogenerators, auxiliary systems, and secondary-side pumps) were provided by Alstom.

The reactors of units 1 and 2 can produce 3,817 MWt. Gross electric power from the generator is 1,382 MWe, and net electric power, after station consumption, is 1,330 MWe, with a thermal efficiency of 34.8%. In 2025, Units 1 and 2 employed approximately 1,100 EDF employees and contractors, and supplied more than half the electricity required in the Normandy region.