Lably
Skip to content

Habshan–Fujairah oil pipeline

Oil pipeline in the UAE

  • 2 min read
  • 4 chapters

Related on Lably

Through Environmental impact assessment and Italy

History

The pipeline was ordered by the International Petroleum Investment Company as a strategic instrument in order to increase the security of supply, and reduce dependence on oil transportation through the Strait of Hormuz. The conceptual design of the pipeline was completed in 2006 by Tebodin. In 2007, construction related contracts were awarded. The EPC contract for the project was awarded to China Petroleum Engineering and Construction Corporation and China Petroleum Pipeline Bureau, both subsidiaries of the China National Petroleum Corporation.

Construction of the pipeline started in March 2008. It was completed in March 2011. Its commissioning was postponed several times and it became operational in June 2012. The pipeline was inaugurated on 15 July 2012 when it made its first delivery of Murban crude to the Pak-Arab Refinery.

Sign in to keep reading

3 more chapters are free with a Lably account.

More in Energy