Helsinki Metro

Rapid transit system in the Helsinki capital region

  • 43 min read
  • 11 chapters
Metrostation Ruoholahti in Helsinki
Ralf Roletschek · CC BY-SA 1.0 fi

Related on Lably

Through Clay and DC motor

The Helsinki Metro is a system separate from the main railway network in Finland, forming the core of public transport in Helsinki along with the Helsinki commuter rail, the Helsinki light rail and trunk bus lines in the capital region.

The system consists of 2 lines, serving a total of 30 stations, of which 21 are underground and 9 overground. It has a total length of 43 km (26.7 mi). It is the predominant rail link between the suburbs of East Helsinki and the western suburbs in the city of Espoo and downtown Helsinki.

The line passes under Helsinki Central Station, allowing passengers to transfer to and from the Helsinki commuter rail network, including trains on the Ring Rail Line to Helsinki Airport.

The metro system initially opened in 1982 as a single line from Rautatientori metro station in the center to Itäkeskus in the east, from which one branch reached Mellunmäki in 1989 and another one reached Vuosaari in 1998. In the center, the line extended to Kamppi in 1983 and to Ruoholahti in 1993. The Länsimetro extension, opened on 18 November 2017, expanded the system westwards via Lauttasaari into the neighbouring city of Espoo with Tapiola and Matinkylä as termini. On 3 December 2022 the line was further expanded to the west all the way to Kivenlahti.

The two lines on the system mostly share the same track: M1 operates between Kivenlahti and Vuosaari, while M2 operates between Tapiola and Mellunmäki.

History

1955–67: Light rail plan

The initial motion for building a metropolitan railway system in Helsinki was made in September 1955, though during the five decades beforehand, the idea of a tunneled urban railway for Helsinki had surfaced several times. A suburban traffic committee (Finnish: Esikaupunkiliikenteen suunnittelukomitea) was formed under the leadership of Reino Castrén (1908–1981), and in late 1955, the committee set to work on the issue of whether or not there was truly a need for a tunneled public transport system in Helsinki. After nearly four years of work, the committee presented its findings to the city council.

The committee estimated that the population of Helsinki would grow rapidly, so the capacity of the street network would not be enough for the growing amount of private car traffic and public traffic. The committee proposed moving public transport underground, which would free the overground street network for private car traffic and keep both the direct costs and the indirect costs of public transport in bounds.

The findings of the committee were clear: Helsinki needed a metro system built on separate right-of-way. This was the first time the term "metro" was used to describe the planned system. At the time the committee did not yet elaborate on what kind of vehicles should be used on the metro: trams, heavier rail vehicles, buses or trolleybuses were all alternatives.

The city council's reaction to the committee's presentation was largely apathetic, with several council members stating to the press that they did not understand anything about Castrén's presentation.

Despite the lacklustre reception, Castrén's committee was asked to continue its work, now as the metro committee, although very little funding was provided. In March 1963 the committee led by Reino Castrén and Gunnar Strenius presented its proposal for the Helsinki Metro system. On a technical level this proposal was very different from the system that was finally realised. In the 1963 proposal the metro was planned as a light rail system, running in tunnels a maximum of 14 metres (45 ft 11 in) below the surface (compared to 30 metres (98 ft 5 in) in the finalized system), and with stations placed at shorter intervals (for instance, the committee's presentation shows ten stations between Sörnäinen and Ruoholahti, compared to the six in the realized system). The Castrén Committee proposed for the system to be built in five phases, with the first complete by 1969 and the final by 2000, by which time the system would have a total length of 86.5 kilometres (53.7 mi) reaching well into neighbouring municipalities, with 108 stations. This was rejected after lengthy discussions as too extensive. In 1964 the city commissioned experts from Hamburg, Stockholm and Copenhagen to evaluate the metro proposal. Their opinions were unanimous: a metro was needed and the first sections should be built by 1970.

Although no official decision to build a system along the lines proposed by Castrén was ever made, several provisions for a light rail metro system were made during the 1950s–1960s, including separate lanes on the Kulosaari and Naurissaari bridges, and space for a metro station in the 1964 extension of Munkkivuori shopping center. The RM 1, HM V and RM 3 trams built for the Helsinki tram system in the late 1950s were also equipped to be usable on the possible light rail metro lines.

The first line was agreed to go from Kamppi to Puotila and detailed planning started in 1965 when a metro planning committee was assigned to plan the metro network. By 1966 the planning had already cost 4.67 million markka while the budget of the city of Helsinki had reserved 475 million markka for the period from 1968 to 1977 despite no decision of actually building the metro yet being made.

1967–69: Heavy rail plan

In late 1967, Reino Castrén departed Helsinki for Calcutta, where he had been invited as an expert in public transport. Prior to his departure Castrén indicated he planned to return to Helsinki in six months and continue his work as leader of the metro committee.

For the duration of Castrén's absence, Unto Valtanen (1929–1989) was appointed as the leader of the committee. However, by the time Castrén returned, Valtanen's position had been made permanent. Following his appointment Valtanen informed the other members of the committee that the plans made under Castrén's leadership were outdated, and now the metro would be planned as a heavy rail system in deep tunnels mined into bedrock. Following two more years of planning, the Valtanen-led committee's proposal for an initial metro line from Kamppi to Puotila in the east of the city was approved after hours of debate in the city council on the early morning hours of 8 May 1969. The initial section was to be opened for service in 1977.

In 1968 the mayor of Helsinki Teuvo Aura and the director of the VR Group Esko Rekola agreed that VR would take care of traffic to the north and west, and Helsinki City Transit would handle traffic on its own track to the east. In connection to this, the idea of a tight network of several light rail lines was abandoned and a decision was made to build two lines conforming to the railway track standard: one line from Haukilahti in Espoo to Puotinharju and another line, the so-called U-Metro line from Haaga via Erottaja and the Helsinki Market Square to Maunula, which would use the same track width as the main railway network in Finland.

1969–82: Construction

The decision to start construction of the metro was delayed because of votes held by the city council of Helsinki. The Left Alliance and some of the council members from the Swedish People's Party of Finland, as well as the liberals, supported construction of the metro, but the National Coalition Party opposed the project for the entirety of its design. Finally, on 7 May 1969 the city council made a decision to start the first phase of construction, and the decision was approved on 12 May. The idea was to have the construction of the line completed by the year 1977.

Construction of a 2.8-kilometre (1.7 mi) testing track from the depot in Roihupelto to Herttoniemi was begun in 1969 and finished in 1971. The first prototype train, units M1 and M2, arrived from the Valmet factory in Tampere on 10 November 1971, with further four units (M3–M6) arriving the following year. Car M1 burned in the metro depot in 1973.

Excavating the metro tunnels under central Helsinki had begun in June 1971. Most of the tunneling work had been completed by 1976, excluding the Kluuvi bruise (Finnish: Kluuvin ruhje), a wedge of clay and pieces of rock in the bedrock, discovered during the excavation process. To build a tunnel through the bruise an unusual solution was developed: the bruise was turned into a giant freezer, with pipes filled with Freon 22 pushed through the clay. The frozen clay was then carefully blasted away, with cast iron tubes installed to create a durable tunnel. Construction of the first stations, Kulosaari and Hakaniemi begun in 1974. The Kulosaari station was the first to be completed, in 1976, but construction of the other stations took longer. As the case with many underground structures in Helsinki, the underground metro stations were designed to also serve as bomb shelters.

When the construction of the metro started, the companies Valmet and Strömberg started developing a series of metro trains suitable for the Helsinki Metro together with other companies. Strömberg made an extensive definition of the technics used for the rolling stock and also made a specific research contract with the metro. As a result, three double-carriage trains were made for test use from 1971 and 1972, and these trains were used for test drives on the test track built between the current depot and the Siilitie metro station. These tests showed numerous problems, for example too little power when driving at a slow speed. The test trains used DC motors. After the tests, a new series of trains was designed in 1974, of which the three first prototype units (numbers 101 to 106) were built in 1977. A VR Class Dv12 locomotive hauled the first carriage pair of the new test trains from the Valmet aeroplane factory in Tampere to Helsinki on Monday 20 June 1977. The new train series was named M100 and it was equipped with induction motors controlled by a variable-frequency drive. The motor control device built for the Helsinki Metro, named SAMI ("Strömbergin Asynkroni Moottori Invertterikäyttö") also became popular elsewhere, and it was used in Finland for example in the control system for the fuel switching device at the Loviisa nuclear power plant.

The first test trains were originally designed as automatic trains that did not need a driver. Already at that time, the Helsinki Metro had been planned as an automatic metro system, and test drives with automatic metro trains were started on 5 April 1974. This plan for automatic metro trains was later abandoned and replaced with a return to completely manually controlled trains and a conventional railway track signal system. One of the test trains caught fire at the depot in 1973, which led to many improvements in the fire safety of the trains, such as abandoning cushions on the seats. These test trains were never used for actual passenger traffic, and the last of them were scrapped in 1988.

The metro carriages were designed by the interior architect Antti Nurmesniemi and the industrial designer Börje Rajalin.

Corruption scandal

In 1974 the metro committee ordered a prototype for a train in the series and gave a guarantee about a follow-up order, bypassing the city council. In summer 1976, Teuvo Aura, the mayor of Helsinki, signed an agreement with Valmet and Strömberg to purchase 13 trains of six carriages each required for the metro from them. The agreed price was 345 million markka, and the deal was made directly, without any contest. The documents were also classified as secret. Teuvo Aura gave the Metrovaunut company founded by Strömberg and Valmet a loan to pay for the trains, and Unto Valtanen, the leader of the committee, promised the committee would take care of the loan interest, causing the city of Helsinki to pay interest for a loan given to an outsider company to itself.

In doing so Aura bypassed the city council completely, reportedly because he feared the council would decide to buy the rolling stock from manufacturers in the Soviet Union instead. Later investigation found out that this had not caused any real damage to the city.

The provincial government started investigating suspicions of Aura overstepping his authority in 1979. A committee formed by the police and the city council investigated the involvement of the mayor, the city council, the metro committee and its leader in the decisions and use of money. The investigation led to all charges being dropped.

By this time the direct current–based technology of the M1 series trains had become outdated. In 1977 prototypes for the M100 train series (referred to as "nokkajuna", English: "beak train", to differentiate from the M1 prototypes) were delivered. In these units the direct current from the power rail was converted to alternating current powering induction motors. The M100 trains were the first metro trains in the world to be equipped with such technology.

Aura bypassing the city council in acquiring the rolling stock was not the only questionable part of the construction process of the Metro. On 3 June 1982, two days after the Metro had been opened for provisional traffic, Unto Valtanen came under investigation for taking bribes. Subsequently, the Supreme Court of Finland charged several members of the metro committee and Helsinki municipal executive committee in addition to Valtanen with taking bribes. In the end it was found that charges against all the accused except Valtanen had expired. On 23 October 1987 Valtanen was convicted to one year and nine months in prison for having taken 80 thousand Deutsche Mark and a motor boat as bribes from Siemens.

1982 onwards: In service

On 1 June 1982 at 05:32 in the morning, the test drives were opened to the general public. Trains ran with passengers during the morning and afternoon rush hours between Itäkeskus and Hakaniemi (the Sörnäinen station was not yet opened at this time). On 1 July the provisional service was extended to Rautatientori. The official opening ceremony of the metro was held on 2 August 1982, five years behind the original schedule. President of the Republic of Finland Mauno Koivisto officially opened the Metro for traffic on 2 August 1982 – 27 years after the initial motion to the city assembly had been made. Regular all-day traffic between the Rautatientori and Itäkeskus metro stations started on the next day. In 1977, the city council of Helsinki had agreed to transfer control of the metro from the metro committee to the Helsinki City Transit. The metro committee ceased to exist at the end of the year 1982.

Feeder traffic was started in phases in early September 1982, and was originally limited to outside rush hours. In 1986 the feeder lines started using a proof-of-payment system, which ended in 1992.

The Metro did not immediately win the approval from inhabitants of eastern Helsinki, whose direct bus links to the city centre had now been turned into feeder lines for the Metro. Within six months of the Metro's official opening, a petition signed by 11,000 people demanded the restoration of direct bus links. Subsequently, the timetables of the feeder services were adjusted and opposition to the Metro mostly died down.

On 1 March 1983, the Metro was extended in the west to Kamppi. The Sörnäinen station, between Hakaniemi and Kulosaari, was opened on 1 September 1984.

The Metro was extended eastwards in the late 1980s, with the Kontula and Myllypuro stations opened in 1986, and the Mellunmäki station following in 1989. The construction of a westwards expansion begun in 1987 with tunneling works from Kamppi towards Ruoholahti. The Ruoholahti metro station was opened on 16 August 1993.

Another new station followed: the Kaisaniemi station, between Rautatientori and Hakaniemi, was opened on 1 March 1995. Its construction had, in fact, been decided on in 1971, and the station cavern had been carved out of the rock during the original tunneling works, but a lack of funds had pushed back the station's completion.

On 31 August 1998, after four years of construction, the final section of the original plan was completed, with the opening of a three-station fork from Itäkeskus to Vuosaari.

The second generation of Metro trains to be used in passenger service (the M200s) were delivered in 2000 and 2001 by Bombardier. These trains are based on Deutsche Bahn's Class 481 EMUs used on the Berlin S-Bahn network.

On 25 September 2006, the city council of Espoo approved, after decades of debate, planning, and controversy, the construction of a western extension of the Metro. Metro trains began to run to Matinkylä in late 2017. (See section The future below.)

On 1 January 2007, Kalasatama station, between the Sörnäinen and Kulosaari stations, was opened. It serves the new "Sörnäistenranta-Hermanninranta" (Eastern Harbour) area, a former port facility redeveloped as its functions were relocated to the new Port of Vuosaari in the east of the city.

On 8 November 2009, the Rautatientori station, under the Central Railway Station, was closed due to flooding caused by a burst water main. After renovations, the station reopened for public use on 15 February 2010. The lifts were fully replaced; the new ones opened on 21 June 2010. On 23 August 2019, heavy rain caused the Rautatientori station to close once again due to flooding. The station reopened in a matter of days, but the lifts again took many months to fix, finally reopening on 17 March 2020.

2006 onwards: The western extension

The construction of the Western extension from Ruoholahti to Matinkylä in Espoo was approved by the Espoo city council in 2006. Construction began in 2009 and the extension was opened on 18 November 2017. This first stage of the extension was 14 km (8.7 mi) long, with eight new stations, two in Helsinki and six in Espoo and was built entirely in a tunnel excavated in bedrock.

After first stage of the Western extension opened, the bus lines in Southern Espoo were reconfigured as feeder lines to either Matinkylä or Tapiola metro stations instead of terminating at Kamppi in the centre of Helsinki. After much outcry, four new peak-time lines began running into Kamppi on 22 August 2018.

Before the extension of the metro, trains could be a maximum length of three units (each unit being two cars) but the new stations west of Ruoholahti were built shorter than the existing stations because it was originally planned to introduce driverless operation. The driverless project was cancelled in 2015, but the shorter new stations mean that the maximum train length is reduced to two units, shorter than on the original sections of the metro. To increase capacity, the automatic train protection system theoretically permits headway as short as 90 seconds, if required in the future.

Due to most of the metro network on the side of Helsinki being outdoors, it is not possible to automate the metro in its current iteration. Full automation (GoA4) of the network would require the entire system being in tunnel. The extreme weather conditions in Finland cause the breaking distances of the metro trains, on tracks running outdoors, to vary even by up to 400%. One option could be to separate the network into two separate lines.

The decision to fund the construction of the second stage, from Matinkylä to Kivenlahti, was taken by the Espoo city council and the state of Finland in 2014. Construction began in late 2014. This stage of extension is 7 km (4.3 mi) long and includes five new stations and a new depot in Sammalvuori. All of the track, including the depot, was built in tunnels. The line opened for passenger traffic on the 3rd of December 2022. As with the first phase to Matinkylä, the feeder lines that used ro run to Matinkylä bus terminal were changed to run to Espoonlahti bus terminal in Lippulaiva shopping centre. Also in common with the first phase, many people were unhappy with the reorganisation of bus lines. Those living in Kivenlahti and Saunalahti, especially, were annoyed at direct bus lines into Kamppi, taking 25–30 minutes, being replaced with feeder lines to Espoonlahti, a transfer to the metro and a half-hour metro ride into the city centre.

Timetable displays

The timetable displays were renewed in 2012 and were taken into use in December 2012 together with the renewal of the metro control system. The old timetable displays were quite old-fashioned backlit LCD displays. Spare parts were no longer available and because of this, the Kalasatama metro station did not have any timetable displays for a long time, nor did the Kulosaari metro station after it had been renovated. One of the old timetable displays has been left in place at the Ruoholahti metro station. One of the old control boards has also been preserved, and it is on display at the Hakaniemi metro station. In April 2006 blue lights and floor markings were added to metro stations to signify the stopping place of shorter metro trains. As well as the timetable displays, some stations also have LED displays on the upper levels, showing the termini of the following trains and the time left until they reach the station. For a long time, these estimated times were based on the timetables instead of the actual metro traffic, but as the new control system was taken into place in early 2020, the systems have been integrated together.

Timeline