InterCity 250

  • 6 min read
  • 5 chapters

Explore on Lably

ToursExplore Lably’s 3D tours

History

In 1985, work began to fully electrify the East Coast Main Line (ECML). This project, which saw the line fitted with overhead wires between London King's Cross and Edinburgh Waverley, took five years to complete. At the same time, a new generation of rolling stock was introduced, with the Class 91 electric locomotives combined with the Mark 4 coaching stock to form InterCity 225 sets – so called because the Class 91 locomotives had a top speed of 225 km/h (140 mph).

Upon the completion of the ECML project, British Rail turned to the West Coast Main Line (WCML). This had been electrified in several stages over a fifteen-year period between 1959 and 1974. However, unlike the ECML the extensive curvature of the track along the route meant that it was ill-suited to running high-speed trains (generally defined in Britain as trains capable of 125 miles per hour or 200 kilometres per hour or more), and so its services were limited to more modest speeds of 100 to 110 miles per hour (160 to 175 km/h). In order to achieve the same standards as the ECML, major upgrades of the track, signalling and overhead lines, as well as a new generation of rolling stock, were required.

During the late 1970s, British Rail had planned to address the WCML limitations with the Advanced Passenger Train project; this circumvented any requirement to make significant infrastructure changes by using tilting train technology. The project reached the prototype stage, with the introduction of three Class 370 electric multiple units into passenger service in 1981. However, initial failures of the tilt technology led to them being withdrawn. They were then used from 1984 to 1986 as test trains for researching the technologies and specifications required for what would become the Class 91.

Sign in to keep reading

4 more chapters are free with a Lably account.

More in Transportation