Lably
Skip to content

West Coast Main Line

Principal railway route in Great Britain

  • 26 min read
  • 9 chapters

Related on Lably

Through European Union

It is one of the busiest rail freight routes in Europe, carrying 40% of all UK traffic.; it is the principal corridor linking the European mainland (via the Channel Tunnel) through London and South East England to the West Midlands, North West England and Scotland. The line has been declared a strategic European route and designated a priority Trans-European Networks (TENS) route. A number of railway writers refer to it as "The Premier line".

The WCML was not originally conceived as a single route, but was built as a patchwork of local lines by several companies which were linked together. The largest of these amalgamated in 1846 to create the London and North Western Railway (LNWR), which then gradually absorbed most of the others; the exceptions were the Caledonian Railway in Scotland and the North Staffordshire Railway (NSR), which both remained independent until 1923. The core route was built mostly between the 1830s and 1850s, but several cut-off routes and branches were built in later decades. In 1923, the entire route came under the ownership of the London, Midland and Scottish Railway (LMS), when the railway companies were grouped under the Railways Act 1921. The LMS itself was nationalised in 1947 to form part of British Railways (BR).

As the WCML is the most important long-distance railway trunk route in Britain, BR carried out an extensive programme of modernisation of it between the late 1950s and early 1970s, which included full overhead electrification of the route and the introduction of modern inter-city passenger services at speeds of up to 110 mph (177 km/h). Further abortive modernisation schemes were proposed, including the introduction of the Advanced Passenger Train (APT) in the 1980s; this was an ill-fated high speed train which used tilting technology, which was required to allow faster speeds on the curving route, and the abortive InterCity 250 project in the early 1990s. Further modernisation of the route occurred during the 2000s in the period of privatisation, which saw speeds raised further to 125 mph (201 km/h) and the introduction of tilting Class 390 Pendolino trains.

As much of the line has a maximum speed of 125 mph (201 km/h), it meets the European Union's definition of an upgraded high-speed line, although only Class 390 Pendolinos with tilting mechanisms operated by Avanti West Coast travel at that speed. Non-tilting trains are limited to 110 mph (177 km/h).

Geography

The spine between London Euston and Glasgow Central is 399 miles (642 km) long, with principal InterCity stations at Watford Junction, Milton Keynes Central, Rugby, Stafford, Crewe, Warrington Bank Quay, Wigan North Western, Preston, Lancaster, Oxenholme Lake District, Penrith and Carlisle.

The spine has bypasses serving the major towns and cities of Northampton, Coventry, Birmingham and Wolverhampton. Spurs serve Stoke-on-Trent, Macclesfield, Stockport, Manchester, Runcorn and Liverpool. There is also a branch to Edinburgh, from Carstairs in Scotland, although this is not the most direct route between London and Edinburgh. It provides a direct connection between the WCML and the ECML.

Originally, the lines between Rugby, Birmingham and Stafford were part of the main spine, until the Trent Valley Line was built in 1847. This line formed a direct connection between Rugby and Stafford, becoming the a part of the spine. South of Rugby, there is a bypass loop that serves Northampton. There is a spur at Weaver Junction north of Crewe to Liverpool, which is the oldest flyover-type junction in Britain. A spur branches off from Crewe to serve Manchester; two more branch off to Stoke-on-Trent: one between Colwich Junction in the Trent Valley, south of Stafford, with another north of the town.

The geography of the route was determined by avoiding large estates and hilly areas, such as the Chiltern Hills, including Tring Cutting; the Watford Gap and Northampton uplands, followed by the Trent Valley; the mountains of Cumbria, with a summit at Shap; and Beattock Summit in South Lanarkshire. This legacy means that the WCML has limitations as a long-distance main line, with lower maximum speeds than the ECML route. The principal solution has been the adoption of tilting trains, initially with British Rail's APT and latterly the Class 390 Pendolino trains constructed by Alstom, which were introduced by Virgin Trains in 2003. A 'conventional' attempt to raise line speeds, as part of the InterCity 250 upgrade in the 1990s, would have relaxed maximum cant levels on curves and seen some track realignments; this scheme faltered for lack of funding in the economic climate of the time.

Sign in to keep reading

8 more chapters are free with a Lably account.

More in Transportation