Lably
Skip to content

IPS/UPS

Wide area synchronous transmission grid

  • 14 min read
  • 5 chapters
IPS/UPS, Russian grid - in red
DA HK · CC BY-SA 4.0

Related on Lably

Through Russia, Watt and Soviet Union

It has an installed generation capacity of 300 gigawatts, and produces 1,200 terawatt-hours (TWh) per year for its 280 million customers. The system spans eight time zones.

Background

The development of electric power industry and power lines in the Soviet Union (USSR) was associated with the GOELRO plan. Subsequently the connection of the lines of the republics including the Russian Soviet Federative Socialist Republic was organized into the "United Energy System" (UES) of the USSR.

On 25 July 1962, within the framework of the Council for Mutual Economic Assistance (Comecon), the Soviet Union, Bulgaria, Czechoslovakia, Hungary, the German Democratic Republic, Poland and Romania signed an Agreement in Moscow, to establish a Central Dispatch Office for the united energy systems of these countries in Prague. According to the agreement, the power systems of these countries were interconnected and operated synchronously with the Unified Power System of the USSR under the Unified Power System "Mir" framework.

As a result of the dissolution of the USSR, the UES of the USSR was de jure divided, but de facto and physically continued to function, including with subordination to the center in Prague. In November 1993, due to a large capacity deficit in Ukraine, the "UES of Russia" and the "IPS of Ukraine" were involuntarily switched to separate operation, which resulted in the termination of parallel operations with the power systems of other participant countries of the Central Dispatch Control in Prague. As a result, the "Mir" energy association was split into several parts. Subsequently, energy system of East Germany VEAG in September 1995 joined for parallel operation with the energy system of Western Europe UCTE, and by October 1995 UCTE expanded further east, which included the energy systems of Poland, Hungary, Czech Republic and Slovakia. The Burshtyn Energy Island had left IPS/UPS and IES of Ukraine on 1 July 2002 and switched to synchronous operation with the UCTE grid.

At the Russia–European Union Summit in October 2001, Russian President Vladimir Putin and European Council President Guy Verhofstadt noted that the goal of interconnecting the power grids of Russia and Europe was in the mutual interest of both parties. In 2003, the CIS Electricity Council (CIS EEC) and UCTE adopted a decision to prepare a feasibility study. The research, conclusions and recommendations were published in 2008.

Sign in to keep reading

4 more chapters are free with a Lably account.

More in Energy