Train service on the bridge began in 1975, while automobile traffic — in 1981. The bridge is part of the railroad line Komsomolsk-on-Amur — Sovetskaya Gavan, and of the highway of regional significance R454 Khabarovsk — Komsomolsk-on-Amur.

History

During the period spanning from June to September in 1932, an important survey was conducted to assess the feasibility of constructing a bridge over the Amur River in the vicinity of the city Komsomolsk-on-Amur. This survey was particularly significant as it took place during the construction of the Baikal-Amur Mainline. The team responsible for conducting the survey consisted of expert professionals from the esteemed Lengiprotransmost Institute. Their primary objective was to evaluate and propose three potential options for the location of the bridge, specifically addressing whether it should be situated upstream, downstream, or within the city limits, extending all the way to the village of Pivan-1.

Prior to the construction of the bridge, the transportation across the Amur River relied on consistent ferry services. However, with the introduction of the Khabarovsk — Komsomolsk-on-Amur — Sovetskaya Gavan railway, a new method of transporting rolling stock emerged. This involved the utilization of railferries, specifically the railway ferries named Project 723, Volga (which was initially referred to as The ferry number 1 until 1952), Don (previously known as The ferry number 2 until 1952), Amur, and Komsomolsk.

In the winter months, a clever solution was implemented to ensure safe transportation over the icy terrain. Long sleepers were used to lay temporary rails on the frozen surface, effectively spreading the weight of passing wagons. This ingenious method became a common practice, starting from 1961, to extend the route of ferries during the autumn and winter seasons.

The construction of the bridge commenced in the year 1969 and continued for several years. It was not until October 1974 that the final pier, one among the total of nine piers, was finally erected, signifying a significant milestone in the project. The process of installing the last span, which was a crucial component of the bridge, was eventually concluded on 1 August 1975, bringing the entire construction process to a successful completion.

The grand inauguration of the primary bridge of the Baikal-Amur Mainline took place on 26 September 1975, marking a significant moment in rail transportation history. As the clock struck midday, a bustling passenger train departed from the bustling station of Komsomolsk-on-Amur, proudly traversing the magnificent structure's first portal. Meanwhile, bidding farewell to their loyal service of over three decades, the ferries that once gracefully sailed across the Amur River bid their final adieu, emitting a series of resonant beeps that echoed through the air.